Showing posts with label belt sander. Show all posts
Showing posts with label belt sander. Show all posts

Monday, April 6, 2020

Fireplace Remodel Day Thirty Eight

Today is Monday April 6, 2020, and it has been almost a week since my last post. Quire a lot has happened since then, most significantly Real Estate and related activity was reclassified as essential business in my country last weeked, so I am back at work....although the pace of business is similar to that of a lethargic snail with a severe hangover. Meanwhile I've been plodding along at the outstanding parts of the almost-but-not-quite-finished fireplace remodel. This post is a summary of recent progress.

So...after the painting was done, I turned back to the hardwood floor, which needed belt sanding to 120 grit and another application of red oak wood filler. Once the filler was dry and the excess removed the floor was sanded through to 400 grit with the orbital sander and declared smooth as a...


Unlike the living area, where the floor color is basically oak plus the yellowing tone of the varnish, the hardwood in the dining room is a markedly different organe-ee-brown tone. We tried to compensate for this by staining the new hardwood colonial maple with a hint of golden pine mixed in. It came out on the C+/B- boundary:


The hue was improved by the addition of varnish - this photograph is one day into the drying time after the final coat was applied. We noticed in the kitchen that the boards we stained acquired a tone closer to the original flooring after about three months; hopefully we'll be able to say the same about this area...whatever happens, we'll be building a cabinet/bookcase over this area eventually.



We will also be buying or building a TV cabinet of some kind, but for now we just need something to put the TV on that ins't the floor. This is the perfect size:


At least it is after I cut it down by ten inches and relocated the central divider.


Just about ok for now...


I also installed the new cabinet doors in the entrance hallway:


I've also been working on the top panel for the shoe rack/cabinet. By this time amazon had delivered the #20 biscuits, so I toddled down tut workshop, and dry clamped on the trim pieces.


This was successful, so I glued on the long trim pieces using the kung fu technique, and then popped back upstairs to find tut sithers.


The next day it was a case of same-again with the perpendicular trim pieces - after we got back from a family trip to the In N' Out drive through. If you were wondering, I had a double double (with grilled onion/no tomato), animal style fries and a large soda. Followed by a food coma. If you've never been to In N' Out, I can only sympathize*).


Either the following day, or the day after that (it's bit of a haze for some reason....), the glue was cured and it was time for the final fit up. The trim overhangs the plywood at the exposed edges, but has to be flush with the base at those edges which meet the wall. Basically, this requires removal of some small sections of walnut trim. I used the circular saw, set to a shallow cut, to tear up the excess material and knocked it down with a chisel.


The next step is to make similar, shallower cuts with the tenon saw and clean up with a chisel.


The last bit was removed with the block plane and the orbital sander.


After finish sanding I applied some walnut filler, and when that was cured, the work-piece was sanded to 400 grit.


I took it upstairs to be varnished; this was done at the same time as the hardwood floor in the dining room.


Came out nice! Right now the panel is curing; I hope to install it this week.


(*If you think you might know what Samual Sheep ordered at In N' Out, post it in the comments. The first correct (or nearest correct) answer wins a gold-colored Ford Tippex, courtesy of those lovely people at Kelloggs Cornflakes; see this link for full competition rules).

Thursday, March 26, 2020

Fireplace Remodel Day Thirty Four

We've been here before. Back on January 10, I had my replacement boards all cut and fitted, but the leveling compound wasn't very level...


I dealt with this as best I could - a combination of the diamond-encrusted screaming wheel of death and a silicon carbide belt on the sander was all it took, and this was all accomplished while this area was wrapped in plastic.


The original plan was to install the new boards with a combination of nails into plywood subfloor, and construction adhesive at the leveling compound...or both for that matter.


The floor went in easily and I weighed it down over night.


This is where it gets interesting, because the next day I discovered that the construction adhesive was a total failure...and this is also where I went back to working on the living room side of the fireplace, covered the mess shown below with a rug, and forgot about it. Well, two-thirds of that is true.....research ont tut' interwebs tells me that I had not waited long enough for the leaving compound to cure...and that the adhesive cannot bond under these conditions.


Today is eight weeks later, so if the leveling compound isn't cured by now, it never will be. I checked the fit of the hardwood flooring after painstakingly grinding all the old adhesive off the back of the boards with the ever-present belt sander.


The boards were then re-installed with more adhesive and nails. I had to bash in the nails in between Amy Sheep's telimedicine appointments.


Then I weighed everything down and went for lunch at the Black Bear Diner a few feet away at the kitchen table.


Today's lunch - a ham, lettuce and mayo sandwich and an orange if you're interested - didn't take all that long. I didn't want to disturb the flooring, so I concentrated on finalizing repairs to the drywall that was damaged when I installed my security lights.


I also installed new baseboard in the office - we weren't ready to commit to a style of baseboard when we decorated this room.


I think I bought 400 feet of baseboard for the living areas, office and kitchen...whatever it was, it I ended up ten feet short, so the section below the office window was made from some scraps of hardwood flooring which I ran through the table saw.


By now the adhesive had had a couple of hours to cure, so I removed the weights, and discovered....another failure. The sections of the boards which were nailed were secure, but the other pieces were flapping around like a syrup in the breeze.


At this stage I could have tried a third time with an alternative construction adhesive , but really I needed an immediate solution. This section of the floor will actually never be seen, because we will be constructing builtin-in cabinets in this area eventually. So....I took the cowards way out and screwed the hardwood to the concrete pad with masonry fasteners.


The new boards were proud of the original floor by 3/32" in places, so I started with the hand plane - this was hard work, but it would have taken much longer and been more dusty with the belt sander.


I cleaned up the shavings and hung a drop cloth between the dining and living rooms...


Then I taped the hose from the shop vac on to my belt sander and gave the new boards a good going over with a 36 grit belt; working this way produced very little dust into the air. In the future I will be trying to find the right fittings so that I can connect the shop vac to all of my power tools.


Red oak wood filler was applied to the nail holes and those unsightly concrete fasteners.


After that there was just enough time to apply wood filler and caulk to the new baseboards I installed earlier, and then it was my turn to drop unconscious from exhaustion.

Wednesday, March 18, 2020

Fireplace Remodel Day Twenty Six

It's Tuesday March 17, 2020, otherwise known as day #26. It's also day #1 of a Shelter-In-Place order in the East Bay. My business, and pretty much every other one in the East Bay is closed, the schools are out and you can hear a pin drop in the street outside. Well, you could until I fired up my belt sander!

This time I started with a brand new 120 grit belt, and I used that to grind off all the excess wood filler I applied at the weekend. I then went over everything with the random orbital sander, first at 120, and then 220 grit.

Tea break time !

This is how it came out; I will sand again to 400 grit right before I apply the varnish...watch this space!


The other bit came out very similar:


After that I installed the new baseboards and taped around the edge of the floor so it's all ready for paint. While all this was going on Amy Sheep was conducting telimedicine appointments from the next room so I had to be quiet as a mouse most of the time.


A new layer of paper went down over all the new flooring....watch this space....!

Tuesday, March 17, 2020

Fireplace Remodel Day Twenty Five

In real time it's been a bit more than a fortnight since Day #24, but this blog is about DIY time, which makes it the next day....sort of. The weekend before last I was at the drag racing with my buddies, but in my absence Amy Sheep did a magnificent job grouting all the tile.  It came out cushty! And she did it all without using tut sithers.


I don't usually do much DIY when the bread snappers are nipping at my heels, but this weekend we were all lying low, so on Saturday afternoon I saddled up my knee pads (!) and nailed down all the hardwood flooring I put down on day #24 (or yesterday in blog speak). I used heat-treated nails this time too, which don't bend like regular 18 gauge finish nails. The heads were sunk with a special punch I custom made last time around.


After that, I broke out the belt sander and some extra coarse 36 grit belts - the floor has been re-finished once in the past, so I had to bring the new hardwood down to the level of the rest of the floor. I took off something approaching a sixteenth of an inch, so it took a while, even at 36 grit.


Same again where the old outlet used to be...


The hardwood was pretty rough afterwards, but I decided not to do any more sanding at this point - instead I filled all the nail holes and tiny gaps between boards with ye olde red oakenshield hued filler, and then I went back to playing monopoly with the fam.

Monday, January 27, 2020

Fireplace Remodel Day Fourteen

OK, so I had about  ¾ 's of a day off work, and it was time to work on the plywood pad in front of the fireplace where the tile will ultimately be installed. I made this panel a while back, but I didn't secure it because it wasn't level - in either direction!


I faffed around for about forty minutes installing shims and hitting some parts of the framing with the belt sander, and I managed to get the plywood as close to level as the rest of the house. That is to say it slopes somewhat, but in an identical fashion to the surrounding floor.


I made the plywood panel quite a bit bigger than I needed, so that the hardwood floor which butts up to the tile will overlap the plywood - and be nailed into it. This way, there is (hopefully) no weak point where the tile may crack. The slight issue here was that my sheet of plywood is about an ⅛ of an inch thicker than the surrounding subfloor. I solved this by marking out exactly where the tile will go...


...and trimming off the excess ⅛ with the a straight bit in the router. This is part way through:


The plywood panel was then screwed off to the framing and secured to the masonry pad with concrete anchors. After that it was solid as a rock and flat too. Yipee!

Monday, November 25, 2019

Entrance Hallway Floor

Welcome to our entrance hallway; it was a lot darker than in looks in this photo. Obviously the slate black tile had to go, apart from the color, it was out-of-wack with the hardwood we have throughout the rest of the entry level, and hasn't been fashionable since the early 80s at best. 


We were pretty sure the tile had been installed over hardwood, because there was a height difference, and the hardwood continued into the hallway closet. This proved to be the case, and after fifteen minutes with a hammer and the hardened steel chisel I made at Riddlesdown High we had all the hardwood exposed. So far so good.


Unfortunately, we discovered that the hardwood was moisture-damaged at the perimeter of the tile-covered section. I think this is the result of years of mopping the hardwood -  small amounts of water leach under the tile, and can't evaporate. After doing a quick damage assessment, it became clear we would have to replace about a third of the hardwood in the hallway. This was much better that I had anticipated, but also means more refinishing work.



First though, we had to remove the residual tile adhesive. Most of it came off with the tile or was loose; the rest of it was softened by applying a towel that had been soaked in dilute acetic acid (vinegar) and scraped off wit' tut palette knife...except the boards which will be replaced which we din't b'ther wit. After that was done, I started pulling up the damaged boards. The first thing I found was a missing section of the sub floor, which I had to fix before I could go any further.



Onto the hardwood installation. I started by custom fitting the first two pieces to make a perfect 90 degree angle. This took some back and forth with the plane, but means the new boards will be parallel to the rest of the old ones, and to the boards in the kitchen, and perpendicular to those in the hallway......which they were not before, although they were close.


Laying down the rest of the boards was straightforward.


I installed a random assortment of 4, 6 and 8 inch boards to replicate the originals, however because I modified the the transition at the kitchen doorway, I had to custom-make the last board to fit into a 5.5 inch gap.


Came out pretty nice. Marty would have been happy with that:


The damaged section at the front of the hallway was repaired in the same way, and then I covered all the new boards with paper in preparation for heavy foot traffic.


A few weeks later it was time to road test my brand new belt sander (Makita 9903, if you're interested). There was a height difference between the hardwood in the living room and the section which had been tiled over - I'm guessing the living room has been refinished at some point in the past - so that's where I started. 


I flattened out the hump, with a 40 grit belt, and then went over all the original hardwood with 80 grit until it looked identical to the replaced sections. The entire hallway then had a good going over with the random orbital sander at first 80 grit, then 120. It looked great when it was done:


We got every bit of dust we could off the floor, including vacuuming in all the groves, and then we applied a very light coat of diluted polyurethane varnish, and sanded to 240 grit with the orbital.


Two further coats of polyurethane and it was all done:



The floor in the kitchen was repaired and the adjacent two boards were re-finished in exactly the same way, although not at the same time! (see this post for further details)