Friday, March 20, 2020

Fireplace Remodel Day Twenty Eight

It's Thursday March 19, 2020, day #3 of Alameda County's Shelter-In-Place order. We're all well, and we're all inside. Amy Sheep is doing the telimedicine thing, and the bin lids are learning online....so let's get painting!

I started with the big windows - all the woodwork got two (2) coats of Benjamin Moore White Dove semi-gloss:


Then the small window - fortunately most of this one is u-PVC...


All the baseboards were next...


And I finished up with the last bits of the shoe rack.


Moved on to the hallway - the ceiling was done a while back, so all I had left was the upper sections of the walls, the new wall, and touch-up of all the minor damage we made while we we putting in the skylight. The walls were painted with two (2) coats of Benjamin Moore Natural Cream flat:



All done before sundown...tomorrow it's the living room walls!

Tuesday, February 11, 2020

Fireplace Remodel Day Twenty One

Today was officially work-from-home day, but fortunately that also left some of time to chip away at the living room. The thinset mortar was cured by this point, but before I could smooth it out I needed to protect the shinny new drywall we textured yesterday. The rough looking framing is designed so I didn't have to put any screws or staples into the new drywall.


After that it was full steam ahead with the orbital sander, and this is how it came out - really very flat and smooth...and totally ready for tiling :)


I went back to my desk for a couple of hours while the dust settled and then I painted primer/stain blocker on all the drywall that we textured yesterday:




I re-installed the doors on the broom cupboard. I also replaced the crappy 1980's brass hardware with brushed nickel and installed the same door handles we put in the kitchen. I'll be building similar doors for the cabinet next to the shoe rack...eventually...


It didn't take long for the primer to dry on the ceiling, so I followed up with two rounds of top coat over the course of the afternoon. At this point the lightwell and the hallway ceiling are officially finished.


Sunday, February 9, 2020

Fireplace Remodel Day Twenty

La-de-dah! It might be Monday afternoon, but I got off work early and Amy Sheep was literally just back from San Diego....so naturally we put t'ettle on tut stove and then sat down on the living room settee* broke out the drywall compound and started texturing the ceiling around the lightwell. Well, you would, wouldn't you? OK, you probably wouldn't, but we want the living room back asap and that means full steam ahead and both hands on the tiller. And Rome wasn't built on a Monday afternoon, was it?


After the ceiling we textured the hallway wall that is now about six (6) inches longer than it used to be...


...and same again on the wall to the right of the fireplace that used to be mostly brickwork.


After that Amy Sheep found something better to do while I slapped a second and final coat of paint on the lightwell, shoe rack and broom closet:





It was well past tea time when I was done. By now the thinset I put above the fireplace yesterday is starting to cure. 


This is how the rest of the living room looks at the moment:




*How could we, we don't have a living room!!

Fireplace Remodel Day Nineteen

Ahh....Sunday....no poached eggs on rye today,  but I did have a very nice lie in and I caught up with family in another time zone. It was another beautiful day on tut farm actually, with not a cloud in tut sky, nor a pair ot sithers on tut sideboard.

I wasn't really planning on doing much heavy work on the living room because I was cream crackered after yesterday, and my in-tray is overflowing with other urgent things to do. But then eeh-by-gum around 11:00 am the Electricity Board decided to cut tut power! Oh well, nothing to do but carry on applying thinset to the fireplace I guess....

Here's the morning-after look. The mortar I put on last night is still soft, so I had to work around it - I actually screeded from the top down this time.


Not perfect, but it is very close and the uneven areas can be worked out with the orbital sander...after the naughty monkeys at PG&E turn tut power back on.


Still no power, so I got my painting gear back out and put the first coat of proper paint on the shoe rack and the new baseboard.


The electricity was back on by now, but since I had the gear out I painted the broom closet as well...


...and the lightwell....all these areas still need another coat of paint, and the ceiling around the lightwell has to be re-textured and painted.


Then I went back down to the workshop and put down the first layer of polyurethane on the three shelves I made yesterday. After that, I reluctantly returned to my office...

Saturday, February 8, 2020

Fireplace Remodel Day Eighteen

Finally it's Saturday again! Amy Sheep fled the folding in favor of SoCal so I was planning a full day of HARD DIY while listening to my choice of music/NPR/power tool(s). We're all sick of not having a living room, so I need to get the fireplace completely ready for tiling, and I need to get everything else ready for painting.

So naturally, I started on the shoe rack. I gave all the wood filler a good going over with the orbital sander, and then it was time to start working on the shelves for the left hand side. The shelves are made from walnut (veneered) plywood, and I knocked them up with a combination of the circular saw and the router. I spent plenty of time getting the first shelf right...


I used the flush-trim bit on the router to replicate the first shelf and then I notched the corner of the bottom shelf and ironed-on some veneer. All ready fort' polyurethane.


Then it was back upstairs to put a coat of primer on the shoe rack. I didn't bother priming the bits that won't be seen or are unfinished.


The lightwell got a coat of primer as well while I had the roller tray out...


This is the broom cupboard in our hallway with the cabinet doors removed. (Note: more on them later...).


This is the same cabinet 45 minutes later after the primer has been applied.


As I was saying at the start, the most important thing right now is getting the fireplace ready for tile; here it is after I removed the timber forms from around the firebox. Not looking too bad.


There was some of the mortar equivalent of over-spray around the firebox (over-flow ?).


Also, the thinset sagged slightly at the thickest section creating several rippled high-spots.


This is the view after I went over the thinset with a 60 grit disc on the orbital sander. It worked quite well, apart from all the dust I created.


Then I applied more thinset to the next section of the wall where the tile will be going, and made it flat with my homemade screed board. It was getting late by now so I cleaned up my tools and called it a day. Which it pretty much was.


Monday, December 2, 2019

Thanksgiving Skylight

Thanksgiving: A time for family, relaxation, good food, sport on TV.....or in our case, time to install a skylight in the entrance hallway. The hallway was always dark, and even though we improved it a lot by getting rid of the black floor tile, it was still markedly dim.

This project started with lifting some of the sheeting we installed in the attic, peeling back the insulation and disconnecting the hallway lighting fixture.


A blank canvas:


I cut out an opening in the ceiling with the oscillating tool and then installed 2"x 6" bracing before the joists were cut out with a combination of my brand new cordless circular saw and the OT.


Framed around the opening with more 2" x 6" lumber which was installed with the trusty nail gun.


Blocking was installed at the attic side to make sure the framing was absolutely solid.


Time to cut a hole in the roof - I cut this from the outside with the new circular saw, which meant no screwing around with extension cords on the roof. It's not obvious in this photo, but we did support the rafter at both ends before it was cut out.


Installed 2" x 6" framing around the opening and the rough edge was trimmed with the oscillating tool.


Went back up on the roof to tear off the shingles around the opening. The weather took a turn for the worse during this operation....


It was a very odd feeling looking through the roof, through the floor, through the open front door and back outside.


The skylight was very carefully aligned over tut 'ole, and we installed the flashing kit which is best explained here.


Patched the roof around the skylight with a variety of shingles...


Ten minutes later it was pouring with rain!


Framed out the lightwell.


Installed the drywall at the lightwell.


All exposed joints were taped at the attic side...


Wrapped the attic side of the lightwell with R30 fiberglass.


Came out nice !!!


*Yeah....we'll plaster it at some point I guess...