Monday, April 13, 2020

Fireplace Remodel - A Summary

The fireplace remodel is all finished, all that remains is to light a fire! We always knew this project would be the "Big One" and it was actually scheduled to be completed some time towards the end of May. Instead, I'm writing this post on Sunday April 12. We stared back on December 27, so in real time, it's been three and a half months. Not too shabby! Here's a brief recap of the process:

Living room fireplace and TV before:


During...


After...


Dining room side of the fireplace before:


During...


After...


Shoe rack before:


During...


After...


Fireplace before:


After...

Not really fire season right now

TV stand before:


After...


Dining room before:


After....

Other side of dining room before:


After...


Stay tuned for the next project(s)....

Saturday, April 11, 2020

Fireplace Remodel Day Thirty Nine

It's been THIRTY-NINE days in blog time, which just so happens to be the same length as a season of the Survivor™ TV show, and....we're done! The final hurdles were the reinstallation of the fireplace doors and the top panel at the shoe rack. One of these was a piece of cake, and the other one wasn't.

This is the fireplace door - it's a lot heavier than it looks, and this is the main issue with reinstallation. Originally, the door sat directly on top of the stone hearth, but that won't be possible going forward...


I must say that this has been the most challenging part of this project - hence it's the last bit - and I've been through a number of design ideas before I got to one that I thought would actually work. I started off by fashioning a couple of supports from a length of 1½ steel angle.


After a quick visit to tut pillar drill, the supports were ready to be installed.


This is the concept: the brackets bolt into the brickwork at the sides of the firebox, and protrude just less than one inch forwards, providing two "shelves" for the doors to sit on.


However, after a quick test I found that the center of the doors sagged under their own weight, puting the glass panels out of alignment. After another lengthy period of head scratching, I came up with a solution that involves running another length of steel angle across the front of the firebox; this turned into an opportunity to fire-up my MIG welder which has been packed away since December 2015. I didn't take any photos of the fabrication, but the following picture shows the finial install:


The top of the firedoor was supported with steel cables which attach to a loop at the top of the firedoor, and a fastener at the top of the firebox.


This is the finished look, all ready for our first real fire!


While all this was going on I also found a few minutes to install the top panel at the revamped shoe rack. I used King's method for the glue up....


I couldn't clamp the panel, so I weighed it down overnight with a few bricks and a gas tank.


Came out real nice....stand by for a summary of the entire project!

Monday, April 6, 2020

Fireplace Remodel Day Thirty Eight

Today is Monday April 6, 2020, and it has been almost a week since my last post. Quire a lot has happened since then, most significantly Real Estate and related activity was reclassified as essential business in my country last weeked, so I am back at work....although the pace of business is similar to that of a lethargic snail with a severe hangover. Meanwhile I've been plodding along at the outstanding parts of the almost-but-not-quite-finished fireplace remodel. This post is a summary of recent progress.

So...after the painting was done, I turned back to the hardwood floor, which needed belt sanding to 120 grit and another application of red oak wood filler. Once the filler was dry and the excess removed the floor was sanded through to 400 grit with the orbital sander and declared smooth as a...


Unlike the living area, where the floor color is basically oak plus the yellowing tone of the varnish, the hardwood in the dining room is a markedly different organe-ee-brown tone. We tried to compensate for this by staining the new hardwood colonial maple with a hint of golden pine mixed in. It came out on the C+/B- boundary:


The hue was improved by the addition of varnish - this photograph is one day into the drying time after the final coat was applied. We noticed in the kitchen that the boards we stained acquired a tone closer to the original flooring after about three months; hopefully we'll be able to say the same about this area...whatever happens, we'll be building a cabinet/bookcase over this area eventually.



We will also be buying or building a TV cabinet of some kind, but for now we just need something to put the TV on that ins't the floor. This is the perfect size:


At least it is after I cut it down by ten inches and relocated the central divider.


Just about ok for now...


I also installed the new cabinet doors in the entrance hallway:


I've also been working on the top panel for the shoe rack/cabinet. By this time amazon had delivered the #20 biscuits, so I toddled down tut workshop, and dry clamped on the trim pieces.


This was successful, so I glued on the long trim pieces using the kung fu technique, and then popped back upstairs to find tut sithers.


The next day it was a case of same-again with the perpendicular trim pieces - after we got back from a family trip to the In N' Out drive through. If you were wondering, I had a double double (with grilled onion/no tomato), animal style fries and a large soda. Followed by a food coma. If you've never been to In N' Out, I can only sympathize*).


Either the following day, or the day after that (it's bit of a haze for some reason....), the glue was cured and it was time for the final fit up. The trim overhangs the plywood at the exposed edges, but has to be flush with the base at those edges which meet the wall. Basically, this requires removal of some small sections of walnut trim. I used the circular saw, set to a shallow cut, to tear up the excess material and knocked it down with a chisel.


The next step is to make similar, shallower cuts with the tenon saw and clean up with a chisel.


The last bit was removed with the block plane and the orbital sander.


After finish sanding I applied some walnut filler, and when that was cured, the work-piece was sanded to 400 grit.


I took it upstairs to be varnished; this was done at the same time as the hardwood floor in the dining room.


Came out nice! Right now the panel is curing; I hope to install it this week.


(*If you think you might know what Samual Sheep ordered at In N' Out, post it in the comments. The first correct (or nearest correct) answer wins a gold-colored Ford Tippex, courtesy of those lovely people at Kelloggs Cornflakes; see this link for full competition rules).

Tuesday, March 24, 2020

Fireplace Remodel Day Thirty Two

It's Tuesday March 24, 2020, so it's been two days in real time since my last post. I've been chipping away at the living room in that time, but mostly I've been waiting for the hardwood floors to be ready for foot traffic.

In the meantime I turned my attention to the panel for the top of the shoe rack - the original to piece was a hideous slab of polished some-kind-of stone, with a best before date somewhere in the mid 80's. Our preference was for some real walnut that would tie-in with the desktops we built for our office. This is the concept:


This is later after I squared-up the three edges which mate with the wall and cut some trim pieces. Now I can make a line where the other three edges need to be cut to be flush with the cabinet.


I used my super long spirit level as a guide for the router's flush trim bit.


After test fitting and tweaking, I cut the rest of the edge pieces...


I'll be attaching the edge trim with #20 biscuits...


....but I cut the slots before I realized I am out of biscuits, so this part of the project is on hold until amazon delivers in a few days time.


By now the walnut shelves I made on day #18 have been varnished and were fully cured, so I installed them in the shoe rack. The bottom shelf is glued in; the others are removable but not adjustable.


I moved on to making the cabinet doors which will go next to the shoe rack. Nobody is more surprised than me that I am working on this part of the project before the Summer. I making the two doors out of ¾ inch birch plywood. I spent plenty of time making the first door absolutely square, and then I used it as a template to make the second door.


Nothing in this game for a pair!

The doors are recessed inside the cabinet face frames. This makes the doors look thinner while maintaining the integrity of ¾ inch panels, and also matches the doors at the broom closet at the other end of the hallway.  The rabbits were all cut on the router table.


Test fitting of the first door was looking good when I got called away to play Cludeo.™ 


To be continued.....