Table Saw Room Refinements Part 4

Earlier this year I built some display cabinets in the table saw room. Some of the cabinets are reserved for storage, and therefore need some doors, otherwise they're just shelves. I've had a few ideas for door designs, but in the end, I decided to return to the concept I came up with for the router table cabinet. This decision means I can make the doors without having to buy any material.

The door frames will be made from red oak. The source of the longer pieces was a hideous 80's TV cabinet that the former owner of my house left behind, and the rest were miscellaneous scraps. I ripped all the bulk material into 1-3/4" wide strips on the table saw. There is some variation in the thickness of oak, so I made pairs of thick and thin strips of similar length. 



Both mating surfaces were planed to remove the old finish, and then wood glue was applied to both sides of the joint:


Everything was clamped overnight:



The glued material is now close to 1-3/4" x 1-1/2".


Face sides and face edges were established at the jointer...


Material was trimmed on the table saw...


And planed on all four sides:


The final dimensions are close to 1-1/2" x 1".


A rabbit which measures 3/4" x 1/4" was cut into the least attractive edge/face:


I figured the easiest way to get all six doors exactly the same size and shape would be to build a jig. The final size of each door is intended to be 30" x 15-1/16", so I constructed a frame that is about six inches longer than that and the exact width:


This is how the jig looks when it has been loaded with the four mitered frame pieces. The fourth side of the jig is installed with two (2) screws, so it can easily be removed. This is important for getting the completed door out of the jig...


I want to dry fit the inset panel before I glue up the frame, so I moved back over to the table saw. I'm making the panels from leftover walnut veneered plywood. I have enough plywood to make the six (6) panels I need, if I ignore the grain pattern. However, the best way to exploit the grain pattern would be to make two pairs of doors....and do something different for the third pair. 


Panel loaded into jig:


After removing all the components, applying glue to the mating surfaces, and reloading the jig, I was ready to install V-nails at the corners of the frame:


I put three V-nails into each corner, and then the door was removed from the jig, and the central panel was clamped to the frame overnight.


The almost finished door looks like the photo below. I need to do some sanding, and I need to make the beading I'm planning to install at the doors.


But, if you've ever read this blog before, you'll already know that I really do not enjoy sanding. So, I moved on to making the final pair of door panels. The concept is basic: the best bits of the remaining walnut plywood separated with some 3/4" wide strips of maple:


The panels were glued-up overnight:


After trimming and sanding off glue residue (below). The outer walnut strips were cut slightly wider than the inner pair. This is because the perimeter of the panel will be obscured by a combination of the edge of the oak frame and the beading; the strips should appear to be of identical width when the door is assembled.


These frames were constructed just like the others, and the panels were glued and clamped overnight:


The last thing to make is the beading, which comes from more scrap red oak. To start with I cut a bunch of 5/16" square strips on the table saw: 


To shape the beading I am using a 3/8" coving bit on the router table, but the size of the red oak stock is too small to pass it safely across the bit..


I cut a 5/16" square recess into a piece of scrap plywood...


..and clamped it in front of the router bit. I can now feed my material through the gap in relative safety:


A total of four passes across the router table were needed to achieve the profile below which is not symmetrical by design. 


As mentioned, the beading is 5/16" wide, but the recess it will be going into is only 1/4" deep. This means that there is 1/16" of material to sand off after the beading is installed. It also means that the profile of the beading will end up being symmetrical or pretty close to it. This overall process gives a much better result than trying to cut beading to 1/4" square in the first instance.


Post beading install, sanding, wood filler, final sanding, more sanding etc.


Finishing with Danish oil, starting with the back of each door:


Fronts finished:


Each door needs six (6) small holes for the hinges and one (1) 3/16" diameter hole for the pull. I made some jigs out of scrap plywood which made this process quick, easy and accurate: 


Cabinet doors installed: 



The big picture:

Friday, July 17, 2026

Table Saw Room Refinements Part 3

At the beginning of May I built some display cases in the table saw room. Since then, I have mostly been sorting through LEGO and working on one or two other projects, but I have also been making progress here too. 

My main concerns for covering the display cases are cost, durability and the perimeter seal, so I'm going with acrylic panels which I can hold in place with a few screws.  I had the panels cut to size at TAP Plastics in El Cerrito, and I drilled the holes myself. I actually bought a special drill bit for use with plastics, but I managed to break it after just a couple of holes; fortunately, a regular drill bit, on a slow setting, worked fine.

I installed self-adhesive "furry" weather-stripping at the perimeter of each cabinet. I am hoping this will contribute to a dust-tight seal. 


Proof of concept:

Once I was happy with the fit of the first panel, I went into mass production mode and banged out the other five.


The two far left cabinets are going to have doors in due course and will be used for storage.


At this point I have four cabinets filled with LEGO and one other cabinet of "collectables." It is easier to take photos of the contents without the panels. I will be looking at installing LED lighting in some of the cabinets in the future. The eighth cabinet is looking like it will be storage for the time being.





Sunday, July 5, 2026

The LEGO Room

I loved LEGO when I was a child, and I was quite old when my collection was boxed up and consigned to the attic. After that I can't say that I thought about it very much until Samuel Sheep was gifted his very first LEGO in around 2010. It was this Buzz Lightyear set if you're interested, and it came along courtesy of Paul Circus. It wasn't immediate, but Samuel Sheep developed a deep appreciation of LEGO, and I was reinvigorated by the adult-themed sets which were becoming very popular at the time.

Fast forward to Spring this year and we have a bunch of models gathering dust (see below) and a huge pile of plastic boxes filled with LEGO. None of the little sheep could care less about LEGO at this point so I have been quietly establishing outright ownership.


I've always wanted to display some of my favorite models in the workshop/man cave, and now I have the cabinets I built here.


The only problem with this plan is that all the assembled models have a few - or quite a few - missing pieces. This is because the collection was never meant to be a work of art and has been extensively "played with." Still, if you're going to display something, it should be complete or close to complete. I've been around LEGO long enough to know that looking for a few particular pieces in a big collection is a futile operation.

It was obvious that if I was going to find the pieces I needed, some serious sorting out was required. What happened next is another excellent example of "project creep." After a whole week of sorting piles of LEGO in the evenings, while watching TV, I realized that (a) this was going to take quite a while and (b) I didn't know what I was going to do with all this neatly sorted LEGO. I had to go big or go home.

So, I went BIG. I moved the sorting area to a 4' x 8' sheet of plywood on top of the table saw, so I had plenty of space to work in and did not need to tidy up after myself in between bouts of sorting.

This....

...went on....

for days....

...luckily, I had help

Eventually I ended up with a pile of boxes in the basement, each of which was filled with many small plastic bags of individual parts.


Before all this started, the LEGO was stored at the lower section of what was our "games and puzzles closet" in the same plastic boxes. In future, this area will be known as the Lego Room.

The first step was to empty the closet of everything that isn't an IKEA shelving unit. Then I removed the middle 2x4 black unit and lowered the horizontal 1x4:

This is after taking the vertical 1x4 unit over to the workshop and converting it into a 1x3 which, thanks to careful measuring, is now exactly the same height as the two other units combined. The two (2) white cabinets were attached to the wall in preparation for the Big One; this configuration traps the black unit so it does not need fasteners.


I made a very swish countertop by slicing up the top panel from an old dining table and attached it to the cabinets with double-sided foam tape. This will make a very nice work surface and took less than ten minutes to cut and install. It also goes to prove that not everything has be glued and screwed.


Hung the first batch of parts cabinets and set the hardware for the ones that haven't been delivered yet.

While all this has been going on I have been considering how best to sort/classify the various LEGO parts. Not wanting to reinvent the wheel, I reached out to my bestest friend, the interwebs, and copied the hard work of The Brick Architect. This website includes an easy-to-follow labeling system which incorporates diagrams of every piece:


Self-adhesive labels can be cut out wit' tut sithers, an' stuck ontut parts dooins drawers:


Phase #1 is getting my sorted parts into correctly labelled drawers:

Phase #2 is organizing the drawers into the same order as the The Brick Architect's parts catalogue:


Plenty of distribution still to do:


I got a bunch of much larger drawers for the most common parts:


Some of the large drawers were subdivided to make the best use of space:


This is a couple of weeks later after the second batch of parts drawers have been hung. It was about now that I realized I was going to need more drawers.


Added two (2) more cabinets at each side of the closet for a total of 12, which gives me 576 of the small drawers and 72 of the larger ones at the bottom of the lower cabinets. I also have 18 of the really big drawers. It's worth noting that a lot of the smaller drawers contain two different parts, so I easily have more than 1000 different parts in my collection. 

I basically got the last four cabinets for free because I was planning to buy this piece of artwork to hang in the LEGO room, and now I don't have room for it. Thus, the cabinets were paid for with money I had already mentally spent. Yay!


This is how the room came out as photographed without a fish-eye lens: 


I found a jpeg of this vintage artwork on the internet and printed it out to use as a door sign.


I got these "lego-compatible" cover plates for inside the LEGO room:


The next project is to find another home for all of the stuff which has been displaced...