New Oven

It's been five years since we remodeled the kitchen - at the time we didn't replace the oven. The one we had looked old fashioned, but it was fully functional so we kept it. Even though it has carried on working all this time, it turns out that this may have been a false economy.

Here's why: The old oven was hard wired into a 220 Volt/50 AMP electrical circuit. And, while the new one is also 220 Volt, it comes with a plug and only requires a 20 AMP circuit (i.e. 40 percent of the power of the old oven). We use our oven a lot, so the cost of running an older appliance for five years would probably go a long way towards the cost of a new oven, if not cover it entirely. Oh well...

Converting the hard wired connection to an outlet at the back of the cabinet was straightforward, and I replaced the 50 AMP breaker at the panel with a 20 AMP breaker. This way I don't have to replace the cable between the kitchen and the circuit breaker panel. 

The other difference is that although the new oven has the same interior space, it comes in a much smaller package, which means the opening in the kitchen cabinets needs to be reduced. I started by building some blocks for the oven to stand on - the appliance will be aligned at the top and center of the existing opening:


I have a lot of scrap walnut plywood kicking around in the workshop, so this was a good opportunity to use some:


The next step is to glue supports at the base and sides of the opening to which the new edge pieces can be attached:


Same at both sides:


Next step is to add the sections which will be visible, which were mounted flush with the existing cabinet front:



The next picture is later after the glue has cured, small gaps have been filled with automotive body filler and the the face frame has been sanded to 220 grit.


Rollered on some primer...


...and two layers of top coat:


With new oven installed:

Saturday, December 30, 2023

The Christmas Cake

My Mother used to make her own Christmas cakes; usually two, one with icing and marzipan and one that was decorated with nuts and cherries. The former was always my favorite. This year I decided to make my own cake using the tried and trusted family recipe. I typed it out below if anyone wants to try it out; I worked from a photocopy of my Mum's recipe notebook.


I started blending the butter and brown sugar by hand, but it was too much like hard work, so I broke out the electric mixer...


Added eggs, flour, dried fruit etc.


Greased my tin. It is not necessary to use butter wrappers, but it is traditional in my family.


Bake in the center of your oven for three (3) hours at 300 F/150 C/GM #2.


Allow to cool to room temperature before turning out the cake:


It is traditional to store the cake for several weeks in an appropriate tin before finishing:

My cake was left in the cabinet for about three (3) weeks after it was baked. The next step is to apply the marzipan. My Grandmother used to make her own marzipan; mine came premade. It is necessary to knead the marzipan for a minute or so and then roll it out; icing/powdered sugar is useful here to prevent the marzipan from sticking to the cutting board.


I took half a jar of apricot jam, added a tablespoon of water and heated the mixture on the stove until it boiled. The boiling step prevents the jam and sugar from fermenting. The residue was strained with a fine sieve:


The apricot slurry is then brushed over the cake - without this step the marzipan will not stick to the cake. 

After applying the marzipan the cake is returned to storage.


A few days later the marzipan was hardened and ready for icing, so I transferred the cake to a cutting board. If I do this again, I will buy a proper cake stand with a cover and use that.

The icing is made by gradually adding four (4) cups of powdered sugar to three (3) whipped egg whites. Sieving the powdered sugar before mixing gets rid of those tiny annoying lumps. 


This gives icing which is easy to apply and sets very hard. Any excess can be applied to cookies or even digestive biscuits if you have some on hand.


I was planning to add decorations and some additional piped embellishments to the icing, but unfortunately, I ran out of time before Christmas, so the cake was served somewhat unfinished, on a cutting board:


It came out OK. The cake was overbaked and dry, but the other bits tasted great!


For the cake:

8 oz butter
8 oz brown sugar
9 oz all purpose/plain flour
5x eggs
8 oz currants
8 oz sultanas/golden raisins
2 oz glacé cherries
2 oz candied citrus peel
2 oz ground almonds
½ tspn gravy browning
pinch of salt
½ tspn nutmeg

Cream the butter and sugar. Add eggs one at a time. Add flour and other ingredients. Bake at 150 C/ 300 F or GM #2 for three (3) hours. Store for at least twenty-eight (28) days prior to consumption. During this period the cake may be finished with marzipan and icing/frosting as above or may be served as is with cheddar cheese.

For the marzipan:

2x 7 oz blocks of marzipan
½ jar apricot jam

For the icing:

4x cups of powdered/icing sugar
3x egg whites

Wednesday, October 23, 2019

Kitchen Remodel Part Three

The kitchen has been a bit of a slog, mainly because we've had several periods of inactivity while we wait for the next bit to be accomplished by someone else. The wall tile was another example. The tile we chose was handmade, and as a result the tiles are somewhat irregular and a good few are slightly bowed. I really didn't fancy faffing 'round wit tut install myself, so we had a pro bring in his tackle and bust the do-ins out of it.



Finally onto the cabinets!!  Started out by taking off all the doors and drawer fronts and took them down to the workshop for processing. Then we emptied out all the cabinets and gave everything a really good cleaning with degreaser, inside and out, and ripped off the old 70's style baseboard

The hardwood floor in front of the sink and dishwasher was water-damaged, and the board next to it was probably the most beaten up in the whole house, so I pulled them up and took the time to install some new oak flooring. The kick panel was in poor shape so I replaced that too. I'll be coming back to finishing the floor later on.



Once everything was nice and clean I installed the new baseboard. We'll be putting the same baseboard in the dining room and office as well....eventually.


Time for some primer! One coat of primer was all it took to totally transform the look of the kitchen. The key to getting a professional finish, is that you only put on a very thin layer of paint - ultimately this meant that we had to paint two coats of primer, but the overall effect was worth it.




Onto the doors: There were 38 in all, including shelves from the glass-fronted cabinet, and every one had to be thoroughly degreased and sanded to 120 grit.



Followed by two coats of primer, applied with a combination of brushes and a roller...



Then it was back upstairs to paint the top coat - Templeton Gray by Benjamin Moore, if you're wondering.



And then back downstairs to do the same with the 38 door panels. Twice.


The following weekend the doors were re-hung and adjusted. I managed to keep the dicking around with hinge adjustment to a minimum by making sure all the hinges went back on the same doors, and we replaced all the knobs and pulls as part of our crusade to rid the house of fake brass. Here's how it all shook down:




PS...if you're wondering how we did the floor, then watch this space...

Tuesday, September 3, 2019

Kitchen Remodel Part Two

Let's get back at it! The kitchen remodel has moved on a lot in the last few months. After the tile was gone, and the walls repaired, it was time to prep for the new countertops. Ripping out the old "some-kind-of-80s-plastic" counters was easy because they were not mounted to the cabinets. Once they were gone, I installed a ¾ inch plywood base for the new granite counters



We hired professionals to manufacture and install the countertops. We had them install the new single-bowl under-mount sink at the same time. I did the plumbing myself.


After the countertops were installed it became apparent that the drywall at the dining room side was badly bowed.....so we cut it out, installed some shims against the studs, and fitted another piece of snazzy purple drywall.



I had to put some blocking behind the wall above the stove so that there is somewhere solid to mount the extractor hood.


This one is later after I patched the dry wall and trial installed the hood - basically it is suspended from two heavy gauge screws. I had to figure out the precise location for the screws before the new wall tile goes up.


Onto the lighting: The original ceiling-mounted cabinet that we removed right at the start of the project had an under-mounted light, which we wanted to replace with pendants. The first step was installing the mounting boxes at the ceiling and running the cables.


Figuring out the wiring at the wall switches was a bit more complex because I decided to replace the antiquated wiring at the dining room light at the same time.


Then it was time to do the usual rinse-and-repeat of skimming the new drywall followed by applying texture.



The new lighting fixtures above the counter and in the dining room were installed a week or so later.



To be continued...