Tuesday, February 25, 2020

Fireplace Remodel Day Twenty Three

As you know, if you read this blog regularly, we usually have a late start on Sundays. Let's face it, who wouldn't loaf around in bed for an extra 45 minutes if they could get away with it? Yada yada...me too! 

This is how the tile looked after the straight edge was removed and we had a good clean up of excess tile adhesive.


Today was fill-in day, so we started with the top edge...


And moved on to the area around the firebox.


Time for the hearth. Started with a layer of thin set mortar to bed in the underlay.

.
We're using Schluter's Ditra uncoupling membrane - this allows installation of tile over any load bearing substrate, it says here. I used my Great Uncle Herbert's old wooden trowel to bed down the underlay. I'll be writing a post in the future about some of the tools I've inherited over the years and those friends and family they've come from.


We started tiling at the center of the hearth. Unfortunately the Ditra membrane was shipped to us rolled up, and I didn't think to flatten it out ahead of time. After the first few tiles went down, the underlay was still trying to re-roll itself


That particular problem was solved with a couple of dumbbells we just happen to have kicking around...


Time to mix what we sincerely hope will be the last batch of thinset mortar for this project. To make sure, I took the rest of the bag down to the basement afterwards.....so...um...we will probably need some more now.


The hearth tile required another batch of individually cut tile at both sides, and we took our time installing them and made sure we got all the pieces the right way round.


I screwed down several bits of scrap wood to hold everything in place while to mortar took hold.


After a couple of hours of set-up time we took off the dumbbells and had a good clean up.


After that there was just enough time left to take the first three (3) crates of tools down to the basement and have a preliminary attempt at vacuuming up dust. The grouting can wait for another time...



Saturday, February 22, 2020

Fireplace Remodel Day Twenty Two

Day #22....in real time, its actually been almost two months to the day since we first swung a hammer, not exactly in anger, but with a strong sense of empowerment. So, it's taken a while to get this far, but I don't think we could have got here any quicker.

It was another beautiful Saturday morning, perfect for a bit of golf actually. But we had other plans, and after a bit of back-and-forth wit spirit level, we got a straight edge attached tut wall which we can use to build our tile.


You have to start somewhere, and we started with the first row of full tiles above the firebox and worked up from there. It may not be obvious, but we have carefully planned out where the tiles will break...


This was as far as we got with the first batch of thinset mortar...


OK, that's the easy bit done....time for a spot of luncheon on the green. Or a quick run overtut chippie fort cod n'chips wit scraps. If only...


As you can see from the next photo, the daylight was staring to fade by the time we got the Schluter edging strips and edge tiles ready to install. This was because we are installing hand made tiles, where each one is a slightly different size and shape....in order to make both outside edges line up perfectly with the Schluter edging, we had to cut all 38 edge tiles individually. Fortunately the water jet-assisted tile saw I bought for the shower pan project was on hand to make this a lot easier than it might have been.


This is how the right side edge came out - quite honestly, it's perfect!


We did the other edge, and filled in the full tiles below the firebox. By this point, fatigue was getting the better of us, so we called it a potato.


To be continued....

Saturday, February 8, 2020

Fireplace Remodel Day Eighteen

Finally it's Saturday again! Amy Sheep fled the folding in favor of SoCal so I was planning a full day of HARD DIY while listening to my choice of music/NPR/power tool(s). We're all sick of not having a living room, so I need to get the fireplace completely ready for tiling, and I need to get everything else ready for painting.

So naturally, I started on the shoe rack. I gave all the wood filler a good going over with the orbital sander, and then it was time to start working on the shelves for the left hand side. The shelves are made from walnut (veneered) plywood, and I knocked them up with a combination of the circular saw and the router. I spent plenty of time getting the first shelf right...


I used the flush-trim bit on the router to replicate the first shelf and then I notched the corner of the bottom shelf and ironed-on some veneer. All ready fort' polyurethane.


Then it was back upstairs to put a coat of primer on the shoe rack. I didn't bother priming the bits that won't be seen or are unfinished.


The lightwell got a coat of primer as well while I had the roller tray out...


This is the broom cupboard in our hallway with the cabinet doors removed. (Note: more on them later...).


This is the same cabinet 45 minutes later after the primer has been applied.


As I was saying at the start, the most important thing right now is getting the fireplace ready for tile; here it is after I removed the timber forms from around the firebox. Not looking too bad.


There was some of the mortar equivalent of over-spray around the firebox (over-flow ?).


Also, the thinset sagged slightly at the thickest section creating several rippled high-spots.


This is the view after I went over the thinset with a 60 grit disc on the orbital sander. It worked quite well, apart from all the dust I created.


Then I applied more thinset to the next section of the wall where the tile will be going, and made it flat with my homemade screed board. It was getting late by now so I cleaned up my tools and called it a day. Which it pretty much was.


Friday, February 7, 2020

Fireplace Remodel Day Seventeen

Day #17 is another compilation of the bits we got done last weekend in between all the other things we had going on. The major thing we were working towards is getting the fireplace ready for tile, and finishing up making dust, especially in the hallway.

First priority was getting the new drywall to the right side of the fireplace and in the hallway ready for texture. This is more or less how it came out; the rough corners in the second photo have since been smoothed out.



We also finished up the drywall in the lightwell. This bit is not going to be textured, so we spent a little bit longer getting it all perfectly flat and blended in with the ceiling. The ceiling will be getting texture sooner or later.


It is not obvious in the next photo, but the shoe rack/cabinet has had some baseboard fitted, and a few other little tweaks.


Then it was back to slapping more thin set mortar onto the fireplace....


Mixing up another batch...


And screeding it smooth  with a very straight edge. There is some overlap around the firebox, and we still have the top half to do.


To be continued...

Thursday, January 30, 2020

Fireplace Remodel Day Sixteen

We always have a late start on Sundays; sometime we have a boiled egg and soldiers too. This particular Sunday we peeked in on mostly-dry thin set around the fireplace:


Some of the thicker sections were not completely cured, but the mortar was rigid all over, so we followed up with two more thin layers over the course of the day.


In between applying thin set, I did some more work on the shoe rack/soon-to-be-cabinet. This how it looked last time after I cut new shelves for the cabinet, made new face frames and mocked it all up with some masking tape:


This time I removed all the new bits - except the back panel - and scraped/sanded off all the old paint. I had to use stripper in some of the corners, but mostly it just peeled off. The cabinet was wood finished originally and when it was painted, it was never primed. Any holes and imperfections in the cabinet were filled with ye olde plastic wood.


After the paint was all gone, the cabinet and the new parts were all sanded down to 240 grit and installed permanently with a mixture of glue, tut panel pins and Kreg ™ pocket hole screws. I also made a new one-piece top panel out of ¾ inch plywood. The top panel will never actually be seen but it provides a lot of extra strength and will support the more ornate top piece we have in mind.


While all that was going on, Amy Sheep worked on skimming the junction of the lightwell with the hallway ceiling:


To be continued....

Tuesday, January 28, 2020

Fireplace Remodel Day Fifteen

Finally it's Saturday! Time to get serious! First things first - we installed a new dust barrier in the hallway; this will enable us to generate dust at the lightwell and around the shoe rack without spreading it around the rest of the house....hopefully.


Next up was sanding the recently skimmed drywall to the right of the fireplace and re-filling the low points. 


Same again in the lightwell...


It came out nice:


And...finally back to the reason we're all here: The fireplace!  The top section of the firebox, and the part to which the glass fire doors attach consists of a length of three (3) inch steel angle. It was set into the brickwork that we bashed out on day #1, but without it the firebox is several inches taller than the doors. A set of replacement doors is over $Grand.00, so I had to figure out a way of re-installing the existing piece of steel.

A fair bit of head scratching went into the how to securely attach the steel. Eventually I shelled out a measly 30 bucks for a six inch ferrous-unfriendly blade for the cordless circular saw and chopped the steel down to 42 inches so that it fitted snugly into the top of the firebox. Here it is resting on a couple of scrap pieces of lumber:


After the test-fit, the steel angle was taken down to the workshop and subjected to the drill press which was armed with one of your finest 5/16th drill bits:


I also knocked up a bunch of spacers from some two inch wide steel bar I happened to have kicking around in my welding bay. I drilled the spacers out to 7/16ths to give me plenty of wiggle room.


The angle beam was then bolted to the brickwork at the top of the firebox with way more concrete anchors than were necessary.


The "finished look":


The steel was not in place more than ten minutes before we installed some timber forming around the firebox to support the thin set mortar.


It took us a couple of tries to get the consistency right, and then the brickwork surrounding the firebox was covered with the first layer of thin set. It will take several layers, but untimely we are aiming for a completely flat wall that we can (easily) tile over.