Showing posts with label drill press. Show all posts
Showing posts with label drill press. Show all posts

Saturday, April 11, 2020

Fireplace Remodel Day Thirty Nine

It's been THIRTY-NINE days in blog time, which just so happens to be the same length as a season of the Survivor™ TV show, and....we're done! The final hurdles were the reinstallation of the fireplace doors and the top panel at the shoe rack. One of these was a piece of cake, and the other one wasn't.

This is the fireplace door - it's a lot heavier than it looks, and this is the main issue with reinstallation. Originally, the door sat directly on top of the stone hearth, but that won't be possible going forward...


I must say that this has been the most challenging part of this project - hence it's the last bit - and I've been through a number of design ideas before I got to one that I thought would actually work. I started off by fashioning a couple of supports from a length of 1½ steel angle.


After a quick visit to tut pillar drill, the supports were ready to be installed.


This is the concept: the brackets bolt into the brickwork at the sides of the firebox, and protrude just less than one inch forwards, providing two "shelves" for the doors to sit on.


However, after a quick test I found that the center of the doors sagged under their own weight, puting the glass panels out of alignment. After another lengthy period of head scratching, I came up with a solution that involves running another length of steel angle across the front of the firebox; this turned into an opportunity to fire-up my MIG welder which has been packed away since December 2015. I didn't take any photos of the fabrication, but the following picture shows the finial install:


The top of the firedoor was supported with steel cables which attach to a loop at the top of the firedoor, and a fastener at the top of the firebox.


This is the finished look, all ready for our first real fire!


While all this was going on I also found a few minutes to install the top panel at the revamped shoe rack. I used King's method for the glue up....


I couldn't clamp the panel, so I weighed it down overnight with a few bricks and a gas tank.


Came out real nice....stand by for a summary of the entire project!

Tuesday, January 28, 2020

Fireplace Remodel Day Fifteen

Finally it's Saturday! Time to get serious! First things first - we installed a new dust barrier in the hallway; this will enable us to generate dust at the lightwell and around the shoe rack without spreading it around the rest of the house....hopefully.


Next up was sanding the recently skimmed drywall to the right of the fireplace and re-filling the low points. 


Same again in the lightwell...


It came out nice:


And...finally back to the reason we're all here: The fireplace!  The top section of the firebox, and the part to which the glass fire doors attach consists of a length of three (3) inch steel angle. It was set into the brickwork that we bashed out on day #1, but without it the firebox is several inches taller than the doors. A set of replacement doors is over $Grand.00, so I had to figure out a way of re-installing the existing piece of steel.

A fair bit of head scratching went into the how to securely attach the steel. Eventually I shelled out a measly 30 bucks for a six inch ferrous-unfriendly blade for the cordless circular saw and chopped the steel down to 42 inches so that it fitted snugly into the top of the firebox. Here it is resting on a couple of scrap pieces of lumber:


After the test-fit, the steel angle was taken down to the workshop and subjected to the drill press which was armed with one of your finest 5/16th drill bits:


I also knocked up a bunch of spacers from some two inch wide steel bar I happened to have kicking around in my welding bay. I drilled the spacers out to 7/16ths to give me plenty of wiggle room.


The angle beam was then bolted to the brickwork at the top of the firebox with way more concrete anchors than were necessary.


The "finished look":


The steel was not in place more than ten minutes before we installed some timber forming around the firebox to support the thin set mortar.


It took us a couple of tries to get the consistency right, and then the brickwork surrounding the firebox was covered with the first layer of thin set. It will take several layers, but untimely we are aiming for a completely flat wall that we can (easily) tile over.

Monday, June 3, 2019

Redwood Drill Press

I wanted a drill press for my workshop. Or "tut' pillar drill" as my grandfather would have called it. Luckily I got one for my birthday! After a LOT of back-and-forth, I ended up with a floor-standing model which can double up as a spindle sander, although I'm not sure if I'll ever really use that feature.

I had to carry the drill press down to the workshop in pieces. I started by putting the column and base together. It wasn't very stable. The manual recommends bolting it to the concrete floor, but I don't want to do that until I'm sure I don't want to move it, and I don't have the tools anyway. 


I think most people would have built a base out of steel, but my go-to material has always been wood. Huh...huh...wood! I got started by gluing up some pieces of scrap redwood lumber that were knocking about innt tut' 'shop. They were leftover from a project I'll be writing about soon.


I put a piece of pine trim around the perimeter - glued and screwed of course - and fastened it to the drill base with a couple of ½ inch bolts. 


Came out very solid. You couldn't knock it down wit' a barge pole. So I went upstairs to empty t' tash pan ;)