Monday, March 23, 2020

Fireplace Remodel Day Thirty One

Ahhh....Sunday again, time for a lie-in....like every one of the last six or is it seven days? After breakfasting on foie gras, quails eggs and Russian caviar, washed down with some freshly squeezed grapefruit juice, we were ready for action.

After very lightly sanding the part-varnished hardwood with some 400 grit paper, we laid down the final polyurethane coat and called it done. We can walk on it properly in 72 hours, which will be Wednesday morning.


After that Amy Sheep moved on to painting the exterior side of the entry door, and I went up to the attic to connect the new outlets we installed on NY eve. While I was at it, I replaced as much of the antiquated un-grounded cable as I could get at. Basically, this....


....became like the photo below. I've replaced more than half the wiring in the attic with ground-carrying cable. This time around I re-cut some of the panels at the attic floor. If When I need access to the electrical in the future, I will only have to lift small sections in the boards.


I also finished up the new recessed lighting in the second part of the hallway...


I put three lights where we used to have only one, and I put two more in the entrance hallway - we lost our original light when we put in the skylight.


By then it was time to pop the hinge pins back in on the entry door for the final time:

Monday, December 2, 2019

Thanksgiving Skylight

Thanksgiving: A time for family, relaxation, good food, sport on TV.....or in our case, time to install a skylight in the entrance hallway. The hallway was always dark, and even though we improved it a lot by getting rid of the black floor tile, it was still markedly dim.

This project started with lifting some of the sheeting we installed in the attic, peeling back the insulation and disconnecting the hallway lighting fixture.


A blank canvas:


I cut out an opening in the ceiling with the oscillating tool and then installed 2"x 6" bracing before the joists were cut out with a combination of my brand new cordless circular saw and the OT.


Framed around the opening with more 2" x 6" lumber which was installed with the trusty nail gun.


Blocking was installed at the attic side to make sure the framing was absolutely solid.


Time to cut a hole in the roof - I cut this from the outside with the new circular saw, which meant no screwing around with extension cords on the roof. It's not obvious in this photo, but we did support the rafter at both ends before it was cut out.


Installed 2" x 6" framing around the opening and the rough edge was trimmed with the oscillating tool.


Went back up on the roof to tear off the shingles around the opening. The weather took a turn for the worse during this operation....


It was a very odd feeling looking through the roof, through the floor, through the open front door and back outside.


The skylight was very carefully aligned over tut 'ole, and we installed the flashing kit which is best explained here.


Patched the roof around the skylight with a variety of shingles...


Ten minutes later it was pouring with rain!


Framed out the lightwell.


Installed the drywall at the lightwell.


All exposed joints were taped at the attic side...


Wrapped the attic side of the lightwell with R30 fiberglass.


Came out nice !!!


*Yeah....we'll plaster it at some point I guess...

Thursday, October 18, 2018

Up On the Roof

We moved at the end of the summer, but by the time the attic was done, it was getting towards the end of the year - and some quick roof repairs were top of the agenda. The roof is in just-about-okay shape mostly, but the ridge shingles were in a mess.



The ridge shingles were basically toast.

Vent pipes and flashings were corroded.

The flashing at the chimney was lifted.

Not to mention an obsolete satellite dish.

Started by tearing off the old ridge shingles.

Installed some new ones.

Took a quick break...

This bit is later...

All done!

Re-painted the vent pipes and flashings

Re-sealed the chimney flashing and painted it

Thursday, October 11, 2018

Boarding Out the Attic

So, onto the attic then? It's probably fair to say that most people, when they move into a new house, don't immediately think about boarding out the attic. But then most people don't have the amount of "stuff" that we do. And anyway, we've never been most people.

The attic, in it's unmolested state, certainly had some positives: For a start it was huge, and it was fully insulated with good quality fiberglass material. It also remains one of the few attic spaces where I've yet to discover any rodent scat. Still, the small access hatch was located at the top of the basement stairwell and there were no floorboards anywhere in the attic.


Not to mention a pair of asbestos-coated flues to deal with...

I called in the cavalry over the Thanksgiving holiday in 2017 and we spent the first morning carving a suitable hole in the hallway ceiling to accommodate my flashy pull-down ladder. I chopped out the joists with a combination of the circular saw (first bit) and and oscillating tool (last bit) and I cut the joists about 1½ inches beyond the opening in the ceiling. The lighting cable running through the middle made it all a bit more complicated.

We're committed now...

Framed around the new opening with some 2" x 6" lumber which I installed with the awesome DeWalt cordless nail gun I bought specially for this project.


We spent the next several days and more parts of weekends than I care to remember boarding out the entire attic with ½ inch OSB sheeting which we installed with 1½ inch drywall screws. There was a lot of trimming to make the boards fit around various obstacles and a lot of shimming because the floor joists were not uniform. Fortunately I had a LOT of help :)

Always wear protective clothing

Heineken refreshers the parts other's can't reach.


We finished up by installing some pre-primed trim around the opening which covered up my slightly jagged original cuts.


After the boarding was done, I installed a bunch of antiquated florescent strip lights which were most recently installed in the shed at our last house. I think this is the fourth (and hopefully final!) time I've wired them in somewhere.


We also installed a thermostatically controlled extractor fan at the gable end...


...and made it so both bathroom extractor fans actually vent to the exterior rather than to the attic space.


This is how the attic looked after we started filling it up



Both the asbestos coated flues were wrapped in foil tape to encapsulate the material.


Painted the attic hatch and trim


Filled in the old opening at the top of the basement stairwell.


I had to re-texture the whole of the stairwell ceiling to hide the repair.