Showing posts with label roof. Show all posts
Showing posts with label roof. Show all posts

Friday, January 30, 2026

Fixin' The Deck Part 17

The last post was focused on preparations for re-installing the perimeter railings, most of which was accomplished right after new year. While all that work was going on I was also looking into a suitable coating to apply to the deck and I decided to go with a "liquid membrane" from Semco. It's a big commitment, so I made a small mockup of the deck from some scrap boards and ordered a pint of the coating:



The material is mid-gray when wet, but dries "slate brown."
 

One half of the mockup got two coats, and then the whole thing was left out on the deck for two weeks while it was mostly raining.


Soon after that we made the decision to go with the Semco product and I ordered a five (5) gallon bucket. I wasn't sure whether to "paint" the deck surface first or install the railings. Applying the coating would be easier without railings to work around and/or splash, but then I would be forced to spend ages walking all over the new surface while I rebuild the railings. The compromise was to apply the coating to a strip about three feet wide at the perimeter. The coating is very similar to the original color of the deck boards:


The perimeter of the deck has moved slightly, but the railings will be going back in (hopefully) the original positions - I took detailed measurements and marked the components as they were dismantled. The one post that we did not remove holds up the roof above the rear of the deck. The sleeve cannot be slid over this post either; it has to be glued and pinned in place: 


I used an empty post sleeve and the railing parts to position the second post which took a little bit of finagling. I also figured out the spot for the post at the front left corner of the deck:


Once I was happy with both locations, I made a template out of cardboard which fits over the post sleeve. The sleeve has a square 5" x 5" footprint and is designed to fit over a (nominal) 4" x 4" timber post:


The second part of the template is a 5" square piece of plywood with a 1/8" hole drilled at the center. When placed together, the center point of the post may be determined accurately.


I put screws at the center of both posts and used an old-fashioned string line and a tape measure to locate the centers of all the intermediate posts; it was too sunny to use the laser.


I used the same method for the other long side of the deck and the short sections of railings at the stairs and next to the exterior doors. Time to drill some holes! After removing each placement screw, I bored a 5/8" hole through the plastic deck board with a spade bit. This hole was extended into the framing/blocking below about another inch or so with a regular 1/2 inch drill bit:


It took a couple of goes to establish my post bracket installation protocol. It goes like this:

1. Center the bracket over the hole in the deck, center the cardboard template around the bracket, and tape in place - the hole in the bracket is not circular, which can be helpful in the event that hole(s) are bored off-line.


2. Apply a liberal amount of caulk to the underside of the bracket:


3. Do the same with the bearing plate:


4. Install a 5/8" wide and 5-1/2 long lag bolt and crank down. The caulk under the bracket makes it slide around when the bolt is tightened; the cardboard template helps re-locate the precise position. Additional caulk is then applied around the base of the bracket, around the bearing plate and over the bolt head:


The post bracket comes with a cap which snaps over the bearing plate and provides a solid foundation for the timber post. The cap is designed to let water out so does not need to be caulked. 


All brackets set:


All the timber posts were replaced with PT lumber and are mounted to the brackets with twelve (12) wood screws.:


First section of railings re-installed: 


I worked my way to the front left corner and halfway across the driveway side of the deck. I am deliberately not installing the rest of the railings just yet. Stay tuned to find out why!


Tuesday, January 27, 2026

Fixin' The Deck Part 16

Good grief, it's almost the end of January! Whatever I've been doing for the last few weeks, it has not involved writing in this blog! At the start of the year, it was raining, but fortunately the majority of the preparation for re-installation the deck railings was accomplished inside. The first item on the agenda was picking through the old hardware:



Most of the post brackets came out ok after going over with wire wheel, but I will have to buy a couple of replacements; a post anchoring set is $30 bucks and I need thirteen (13), so it was well worth cleaning up the ones I can reuse.


Very few of the L-brackets were salvageable, so I ordered replacements and I will also be getting new lag bolts. 


This is what the pile of railing components looks like after eighteen months of sitting in the back yard. I should have covered the parts with a tarp, but instead they have been covered with decomposing leaves for most of that time and have the stains to prove it.


It was still raining at this point, but I did my best to ignore it, set up the pressure washer, and worked my way through all the railing components. Pressure washing in the rain isn't much worse than doing it on a dry day because I always manage to hose myself down.


Pressure washing was a big help, but I wasn't able to remove the worse stains, so I set up my paint both in the backyard and worked my way through the mountain of parts.


Stains like this....


.....were essentially eliminated with Rust-oleum gloss enamel and everything looks way better:


The gutters and the gates were pressure washed and painted after it stopped raining:




Next up: stucco repair. I had to bust out some of the stucco outside the dining room to get the old deck boards out, and it has never been repaired. There are a few other places where the stucco has been damaged including next to the garage where I removed an obsolete hose bib, but this is the big one. To start with I removed all the loose stucco and peeled back the good material a couple more inches to expose the framing. I cut out the remaining bits of original wire mesh and patched the tar paper behind the stucco. I then installed a piece of much finer mesh over the tar paper and took the photo below:


The next photo was taken after the first coat of replacement stucco has been applied. I'm not the best at masonry so I studied on youtube ahead of time. I am using a 3/4 in. piece of scrap wood to ensure there is straight gap between the lower edge of the stucco and the aluminum flashing:


The second or "textured" coat is applied before the initial round of stucco has completely cured:


After complete curing and painting with primer. It would have been much more difficult to make this repair with the deck enclosure installed. 


To be continued....

Thursday, December 18, 2025

A long-awaited update on the deck

Everybody has problems. Some of them are more serious than others, but we all have 'em. When John Lennon sang that "...there are no problems, only solutions" it is widely agreed that he was talking bollocks. He was certainly speaking without knowledge of our deck and the monster list of issues we've had with it. 

If you're not already familiar, please don't bother reading the other fourteen (14) parts of the series, just know that the deck above the garage was leaking, and getting worse every year. I know, a deck above a finished ceiling, who'd have thought? Anyway, back in August 2023 we started trying to fix/replace the deck and, after much more than our share of problems, we were patting ourselves on the back at finally getting the deck boards down in June 2024. The "finished" deck looked like this:


By November of 2024 I had rebuilt the steps which lead down to the front yard...


...and we were considering options for new railings and a spiral staircase down to the rear yard:


And then.....wait for it....and then it started raining. Yep, that's right, raining. We quickly learned that, in spite of our best efforts, the deck was still leaking into the garage; it wasn't as bad as it had been, but we could not ignore it... 

After much consideration of what to do next, we took the only action that we had open: fill the gaps between deck boards with caulk. Although filling the so-called drainage grooves won't help shed water, it should prevent any further leakage into the garage. Several weekends in December 2024 were spent very carefully installing caulk into the deck grooves. We even covered the fresh caulk with tape to prevent contamination with leaves, cat footprints etc.


However, after more rain in the early weeks of 2025, it became obvious that the caulking was in fact our latest failure. On close inspection of the deck, it was apparent that the caulking was heavily blistered, and thereby porous - the deck was actually leaking more at this point than before we started working on it. 


In the Spring of 2025, I decided to take a completely new approach to the problem: I started working on my '67 F250 truck instead and switched off completely from the deck. When the truck was done (you never say finished!), I moved on to swapping the engine in the '68 Mustang. The deck was the last thing on my mind for months, and I was all the better for it. 

Having said all that, the very fact that this post is being painstakingly typed out indicates forward progress. That movement was born out of the realization that I had to do SOMETHING before the proper rain comes. So, almost a year since I last wagged a finger in that direction, I came up with a three four point plan to rescue the deck once and for all:

1. Get as much blistered caulk out of the deck grooves as possible.
2. Install caulk which is not sensitive to UV-light.
3. Cover the whole surface with a waterproof membrane like on a proper roof.
4. Put the railings back and get on with life.

Step one is not as simple as it sounds - removing cured/blistered Lexel is complex at best. After some experimentation, it turned out that the ideal removal tool has a sharp V-shaped blade which fits perfectly into the grooves between boards. The one I used is designed for making linocuts:


Although it worked quite well, using this tool by hand across the entire deck would have taken weeks and more hands than I have available. The first modification I made was to file down the wooden handle...


And insert the tool into a three (3) foot steel gas pipe. This makes the tool mush heavier such that it can be used with two hands and slid several feet along a groove with a single thrust, so to speak. 


Further modifications included fixing the blade into the handle with super glue and wrapping nichrome wire around the end of the tool to stop the wood splitting. The tape stops the wire from unravelling. 


The battlefield after a number of "thrusts:"


Waste caulk can be swept away....


The replacement caulk I am using is UV-resistant. Installation this time around was focused on getting plenty of caulk laid down without worrying about the overall appearance:


Installation of the replacement caulk was completed this past weekend, and as of right now we have had one half day of rain with no evidence of water intrusion. We have rain forecast for at least the next ten (10) days - it is winter after all - so by the end of that we should know the score. 

To be continued...

Sunday, July 28, 2024

Fixin' The Deck Part 14

The last post in this series ended with the completion of the stairs at the front of the deck, and the installation of fascia board at the sides of the stairs. The area above the garage door is also ready for fascia boards....which just leaves the fence side of the deck and the rear. These areas were a little bit different. The rear has some oddly shaped rafter tails to work around and lots of gaps, and there were a number of similar gaps at the fence side:



I worked on the rear-facing side first - the rafter tails were padded out with small pieces of wood, and sections of 2" x 4" PT were installed between each rafter tail.


Rafter tails were also extended and/or trimmed as necessary:


It seemed easier to box in the areas between rafter tails at the fence side:


Once installation was complete, everything was given a coat of primer, and any remaining large gaps were filled with expandable foam.



The next day all the gaps were filled with big stretch and.... 


...then painted house-color gray:


With all of that done, I'm ready to install the fascia boards, which is the last step before gutters. I began above the garage. These sections of the fascia were salvaged from the original deck and painted with primer in the garage prior to installation.


There was a small gap between the facia board and the stucco, which I filled with expandable foam. The blue tape makes it much easier to get rid of the excess foam later:


Which looks like this:


Or like this after a bead of caulk has been added:


Continued adding fascia at the fence side and rear. These sections were replaced with pre-primed material. I need to get the new fascia boards painted, and then I can install the gutters.



To be continued.!