Showing posts with label stairs. Show all posts
Showing posts with label stairs. Show all posts

Sunday, March 12, 2023

Central Yard Part 4

We've been having awful weather, not just lately but pretty much since the start of the year. Ice on the windshield in the moorings has only been punctuated by endless days of rain and even a few hailstorms. During one break in the onslaught, I managed to sneak outside are start rebuilding the steps that I destroyed a few weeks earlier.

The first step was to re-expose the concrete pier from the old stairs; I'll be building a new pier just behind this.



Dug out for my new pier. The railing posts will be set about a foot deeper tthan the pier.


The next step was to attach the two primary stringers to the deck - I just reused the original joist hangers since there was nothing wrong with them. I was also able to reuse all four original stringers after the rotten sections were trimmed off. I finagled the bracing until I had both stringers level, parallel and plumb with the deck, and then I built some temporary bracing from scrap lumber.



I used a scrap piece of 4"x4" to make sure the footings were in exactly the right places...


...and that was it, because the heavens re-opened and forced me to retreat indoors.


It was over a week later when decent weather and free time coincided, and by then I was busting a gut to get my posts installed and braced:



After that I built a form for my concrete pier: 


I went get the wheelbarrow; it was about a third full with rainwater:


I figured I would need about six bags of concrete for the pier. Fortunately I bought a couple of extra bags, plus there were three more in the garage that I was saving for another project...


Eleven bags was just enough. I had planned the pier to come to the top of the form, but It fell a couple of inches short. 


This is a few days later after the concrete has cured, the forms have been removed and the area around the pier has been backfilled. If you strain your eyes, you can see two pieces of rebar which protrude about a foot from the concrete:


The next step was to cut and drill holes in a piece of 4"x 6" PT which will sit on top of the pier and form the base for the stringers to attach to. 


After the timber is installed, the rebar is "turned over" to provide an anchor. This method was used in the East Bay in the 1930's to secure timber framed houses to concrete foundations; anchor bolts came in the next decade.


The secondary stringers were then leveled, trimmed to the precise length and fastened to the base.


I numbered the treads and risers before I took them apart, so re-installation was pretty simple.


I had to make new cutouts to accommodate the posts:


After that the post were trimmed to the appropriate length, and wood preserver was applied to the exposed end grain.


The sleeves were slipped over the posts, shimmed, at the caps re-installed.


I did not put the railings or handrails back just yet because I will doing some repair work to the deck in the next couple of months....stay tuned to find out exactly what!

Friday, December 3, 2021

Basement Expansion Part 10

At this point the project has settled into a cycle of digging out the next section of the perimeter, installing rebar, building forms, and pouring concrete. Rinse and repeat. We can only pour about forty (40) inches of perimeter at a time, so to speed up this process, we needed to work a night shift attack from both ends.

This is the view at the other end of the basement looking towards the workshop. At the center of this area is a cinder block retaining wall which the pervious owner of the house did not complete - the footing extends into the foreground in the photo below. To the right is the foundation which supports the front entrance porch. This section of the concrete has been braced with timber at some point in the past because it leans. I don't want to disturb the porch foundation or the cinder block wall, so I have to figure out how to fill-in the gaps and join these areas to the new foundation.


This is sometime later after I dug out the dirt/rock below and behind the porch foundation and poured a new bench foundation to support the porch. 


The rebar that protrudes from the new concrete will join up with the rest of the new bench foundation later. This is how it looks after the rebar was trimmed and capped off with some scrap lumber - safety first!


Top marks if you predicted what comes next. If you didn't, the answer is stairs. The forms for the risers were constructed from nominal 2" x 8" doug fir, so they are actually 7½ inches high. The cinder blocks are 7¾, so there was a bit of fudging going on, but I did make sure that all the steps are level left-to-right.


I installed the rebar intro the new concrete, and did my best to attach it to the cinder blocks.
 

Just add concrete...


And there you have it, a set of stairs:


Tune in again next tine to see where the staircase leads to...