Tuesday, February 14, 2023

Central Yard Part 3

Back at it! The following picture might not look like much, but this is the last bit of the yard that I had to clear of small rocks and general crap that was leftover from the concrete pour. Now we're ready for landscaping soil and more moss rock!


The next day I had three cubic yards of soil and another pallet of rock delivered to this exact spot:


And I had another 1.5 yard bag of soil dropped off where the original entrance walkway used to meet the street:


There was a little bit of daylight left after work on Friday, so I made a gentle start with the wall in front of the porch. I think I raised the level by one more course and did a bit of backfilling...before I figured it was time celebrate the end of the week from the sanctuary of the living room.
 

Next day, new target: fill the area in front of the house with soil!


Luckily Samuel Sheep was on hand to help shovel the dirt in tut' barras.


This is what one bag (or 1.5 cubic yards) looks like spread out. Lets just say that it was apparent very early in this process that we would be needing a LOT more soil.


The next day Amy Sheep popped out to help. We used some of the soil we had left to construct banks  where we want to build moss rock retaining walls:


This is how they look completed; there will be a lot more soil between the two barriers eventually.


We also finished off the wall in front of the house and backfilled with soil so that there is a uniform upward slope across this section of the yard.


We used the last of the soil to regrade the area where the front path used to be:


At the end of the weekend, the area in front of the house was looking a lot better, but could still use a couple more inches of soil, especially after the new material is compacted.


However, we still need a whole bunch of dirt behind the retaining wall and at the other wise of the walkway...



To be continued....

Saturday, January 21, 2023

Central Yard Part 1

Finally a nice day, and I have the afternoon off! 


We have been bursting to get to work on "making good" the areas around our new concrete.  However, the first thing we have to do is apply sealer to the porch and walkway. The sealer will prevent stains at the new concrete and should protect the surface. To begin with I had Amy Sheep clean up the walkway and the porch with our noisy leaf blower, while I filled up the sprayer.


We are using a water-based matt sealer which does not require dilution:


Amy Sheep applied a light coat of sealer to the porch and walkway, and rebutted any offers of help apart from when the sprayer needed refilling, so I just stood around snapping photos and generally enjoying the first nice day of 2023.


After the sealing was completed, we went inside and had some tea and biscuits and what not, and when I came back outside the sealer had dried and Amy Sheep was nowhere to be seen. I busied myself adding dirt to the voids at the uphill side of the new walkway, until the path was just a couple of inches above the dirt:


Then I laid my first course of moss rock against the path....


Then backfilled with more dirt up to the top edge of the moss rock...


And then rinse and repeat. I managed to build the section of "wall" you can see below from rock that we had on hand. Amy Sheep was nowhere to be found while this work was going on.


I have been backfilling with some rather nice top soil that was left over from another project. When this runs out, we will have to order some more from tut' garden center. 


I broke into the pallet of rock that has been sitting outside the house being rained on for the last couple of weeks...


Progress after a couple of hours....still no sign of sign of Amy Sheep.... 


The next day Amy Sheep emerged from her hiding place and we went to work building up the dirt and adding more moss rock to the uphill side of the path. The gradient is such that less rock is needed as we work towards the street.


The pallet of moss rock was shrinking fast by this point.


We managed to extend the rock all the way to the street...


...and build a sizeable wall at the porch side, before we ran out of rock and topsoil. The wall needs to be a layer or two higher in places.


To be continued....

Monday, December 19, 2022

Driveway Remodel Part 5

The final part of this long-running project is the walkway from the street to the house. I dug out the old walkway a while ago. We used to call it the "path to nowhere" because we never walked on it.  


This is the layout for the new path which leads from the driveway/street....

...to the porch...


...and on to the gates which lead to the part or the yard where the raised beds are located:


This is quite a bit later after the forms have been constructed and the rebar installed:



I was at work during the pour, so I don't have any in-progress photos. These pictures were taken in the late afternoon after the concrete has been stamped with a slate pattern. This helps differentiate the path from the other vast swathes of concrete.



We have some regrading to do between the path and the retaining wall that will have to wait until the new year.


The very last thing is the porch which we modified ourselves a while back. 


The original plan was to cover the porch with paving stones, and also to pave the entrance walkway....but we didn't have the budget after paying for the retaining wall and the new driveway. 

Instead we had the porch covered with a thin layer of mortar-like material and then stamped with the same slate pattern as the walkway. The photos below were taken just after it was finished. We have to wait three days before we can clean off the powdery release agent, and then in a few weeks we can apply sealer to the porch and the walkway.


Monday, May 30, 2022

Memorial Day DIY Extravaganza

Memorial Day weekend means different things to different people. Years ago, it meant a trip to the INDY 500. These days it mostly means an extra day off work/school. This particular year I blagged Friday off work too and spent far too much of Wednesday at my local Big Box store, where I exchanged some serious moolaw for a couple of bags of plumbing fittings and a roll of masking tape. Unlike most entries in this blog, which are written days, weeks or more commonly months after the events, this post is a daily blow-by-blow indulge-a-thon of a very memorable Memorial Day long weekend.

Thursday

As it happens, I had a light-ish week at work and I was totally done by lunchtime on Thursday, which is exactly when the latest 10-yard rock box was dropped off in our driveway:



I wasn't planning on doing much outside on this particular day, but since I was done with my day job and the dumpster was on site, I set to work on the pile of rubble that used to be our front porch: 


If I have any room left in the dumpster, I'll be adding the entrance path too:


First things first: I built a very sturdy ramp out of the forms I had left over from the basement project. I had to dig a passage through the pile of dirt that came out of the basement.


The ramp worked really well:


I found it worked best with a half full barrow - much more weight, and I struggled to lift the barrow upright at the top of the ramp....so another example of "little and often."


By the close of play on Thursday, the dumpster was just less than half full:


I think I have reduced the pile of rubble by three-quarters or more, so it's looking good for the pathway.

While all this was going on, Amy Sheep was working on what will be out Prize Pumpkin Artichoke Patch. At the start of play it was looking a bit neglected:


This is later after all the weeds have been pulled and the dirt has been turned over with the jackhammer's spade attachment. The pile of ornamental rock in the foreground needs to find another temporary storage location.


The last little bit of our fenced-off enclave has also become somewhat overgrown in the last few months. If this was part of a golf course, it would be deep rough at best.


Most of the weeds were removed from this area just in time for the day's last over.


Friday


Friday was another somewhat dull day - perfect for what we had in mind in fact. After a quick breakfast of pain au chocolate and café latte, Amy Sheep picked where she left off with the weeding.


I carried on humping increasingly smaller bits of broken brick and concrete into the dumpster and by late morning I was done, and the tarps had been pulled up.


Next victim: the pathway between the street and the brick porch we don't have anymore. I started off by popping out the brick ribbons - this bit was a piece of cake.


About this time is when the folks from tut' Rock and Soil came by and dropped off four cubic yards of ye finest olde topsoil.


I was feeling pretty good about my progress with the path, so I took a break from jackhammering and helped Amy Sheep dump some of the topsoil on the soon-to-be pumpkin artichoke patch. 


This is later after the topsoil has been spread out to uniform thickness:


This is the downhill area after weeding and after we removed another half dozen or so barrows of infertile subsoil.


At this point Amy Sheep had to run to silly point for a couple of hours so I went back to demolishing the concrete path and transferring the debris to the dumpster. Most of the slab was six (6) inches thick so this turned into quite some effort.


The dumpster was starting to look a lot closer to full than empty by stumps; this is a legacy of the concrete path being so thick!


Saturday

I was out on the pitch bright and early after just a quick piece of toast and got the ball rolling by building a ramp to the downhill area.


Then it was back to breaking concrete. This was hard work because the concrete was so thick, and I was becoming concerned over whether there would be enough space in the dumpster.


While that was going on, Amy Sheep was depositing more premium topsoil at the downhill bed. The exact moment when the dirt spreading was completed did not make it into the photographic record. What is most memorable about that instant is that it signaled Amy Sheep's rapid departure from the crease in the direction of the Nursery (or tut' Garden Center as my grandpa would have called it).


I carried on plodding away with the pathway. By late afternoon I had got rid of all the big chunks.


Eventually it was done! The pathway has left a scar in the landscape that is four feet wide and almost a foot deep. 


This is what a completely full dumpster looks like:


And this is what a driveway looks like when it is partially filled with broken up concrete:
.

By this point Amy Sheep had returned heavily laden with a variety of plants, but unfortunately no pumpkins. Looks like we missed the boat this year. Instead, we'll be growing artichokes in the uphill bed and a variety of drought-tolerant plants and flowers lower down.



It is very important to liberally water new plants:


Sunday

After two and a half days of very hard labor, the plan for Sunday was take it easy. We kicked off by spending two hours on the couch watching the Monaco Grand Prix. After that is was time to pad up and head back to the crease.  We had some topsoil left over which we dumped in the area which until a few days ago was covered with broken up brick and concrete.

We also spread out some coarse gravel in the valley where the entrance path used to be. And that was it. The rest of Sunday was reserved for socializing and relaxing.

Monday

If you were paying attention at the beginning, then you may be wondering why I mentioned buying plumbing fittings. The answer is that when we built the porch a few weeks ago, I had to remove to hose bib that was in the way....and the time has come to replace it.

This is view of the hose bib supply line from inside the basement. I fitted a removable brass cap after I cut the pipe back.


This is the same supply line  viewed from further away - it passes through the stud wall which supports the porch. I've been wanting to strength this section of the foundation for a while, and it will be much easier to do so without the pipe in the way.


So....after shutting off the water and draining the system, I used my close-quarters pipe cutter to chop the pipe back a couple of feet in front of the stud wall, and fitted a new shutoff valve. 



With the pipe out of the way I was able to fit a plywood panel and install it with the appropriate nailing pattern. 


I also installed similar panels at the perimeter of the new section of the basement - these panels are not structural, and are just held up with a few screws. After that I decided the plumbing lines and hose bibs can wait until next time.  



There was just enough time left to to check on our strawberry crop - we have been getting tons more fruit this year.