Showing posts with label organic. Show all posts
Showing posts with label organic. Show all posts

Friday, December 9, 2022

New Leaf Pens

A few years ago Samuel Sheep and I built a leaf pen in the far corner of our yard. By now we have a thick pad of composted material which we need to harvest. However, because leaves take at least two years to completely breakdown, the material we want is hidden below a layer of partially decomposed leaves. What would be ideal is if we had two leaf pens which could be filled (and harvested) on alternate years. It's also worth noting that the existing pen is a bit...well...crap. I think you can imagine where this is going...


I started off by picking up some eight foot lengths of 2" x 4" pressure treated lumber and 1" x 2" redwood trim.


I cut seven of the 2" x 4"s in half on the mixture saw:


Drilled pocket holes in the timber (both sides):


Fortunately I had a few redwood 4" x 4" posts left over from the fence we built in out front yard a couple of years ago...I probably couldn't afford to buy them now. 


Constructed the first pen. 


All the joints were made with pocket holes screws which are quick and easy to install and make a very strong connection.


The ground slopes away from the fence and right to left across the yard, so the redwood corner posts had to be individually measured and cut on site with the cordless circular saw.


Added the second pen...the original chicken wire pen is just visible to the right of the new ones; the new location is mostly hidden from view when you're inside the house.


The gaps at the base of the pens were filled with some scraps of pressure treated lumber which I had kicking around in the workshop.


The side and and rear panels of the pens will be made from wire deer fencing since we have almost a whole roll of this material left over from the front yard enclosure. The first step of this process is to cut the redwood 2" x 1" trim into four foot pieces. Screw holes were then bored with the drill press.


The trim is installed at the perimeter of each panel, and set back 7/8" from the rear edge of the frame:


Time to cut up some wire mesh into rectangular sections...


The mesh is secured to the trim with staples:


A second layer of redwood trim is then added to sandwich the mesh and hopefully keep it taught and secure....it worked on the fences at the front yard!


This is the "big picture." The mesh is essentially invisible from ten feet or more away. 


There is no mesh at the front facing panels because gates will be going there. The framework for each gate is the same 2" x 4" PT for the vertical sections and I used redwood for the horizontals; the redwood was also left over from the front fence, but I only had short pieces.


Each gate has three (3) panels to fill with wire mesh, so I got to work cutting and drilling more short pieces of 2" x 1" redwood. Almost all of these pieces were salvaged from material I had on hand.

This is later after the trim and mesh has been installed at the first pair of gates:


I used a mixture of shims and clamps to get the gates in the precise position, and then installed the hinges. The gates are quite heavy, so I bought hinges which are rated to 50 lbs.


All four gates installed:


The design was copied from the gates at our front yard:


Time to do something with this area...


The "tree" at the apex of this area is dead, and what appears to be "foliage" is actually a mixture of branches which belong to trees in the neighboring lots.  


This is the same area after I removed the old leaf pen and trimmed back some of the encroaching foliage.


A close up of the brown bread tree:


This is the same area after the top few inches of partially decomposed leaves were removed and deposited in the first pen. As you can see we have a huge pile of pristine compost which is about a foot deep. We have plans to use this elsewhere in the yard


By this time next year, we'll be millionaires the eaves in the first pen should be similarly decomposed:


Started filling the second pen with leaves that fell this autumn...plenty more where these came from...

Monday, May 30, 2022

Memorial Day DIY Extravaganza

Memorial Day weekend means different things to different people. Years ago, it meant a trip to the INDY 500. These days it mostly means an extra day off work/school. This particular year I blagged Friday off work too and spent far too much of Wednesday at my local Big Box store, where I exchanged some serious moolaw for a couple of bags of plumbing fittings and a roll of masking tape. Unlike most entries in this blog, which are written days, weeks or more commonly months after the events, this post is a daily blow-by-blow indulge-a-thon of a very memorable Memorial Day long weekend.

Thursday

As it happens, I had a light-ish week at work and I was totally done by lunchtime on Thursday, which is exactly when the latest 10-yard rock box was dropped off in our driveway:



I wasn't planning on doing much outside on this particular day, but since I was done with my day job and the dumpster was on site, I set to work on the pile of rubble that used to be our front porch: 


If I have any room left in the dumpster, I'll be adding the entrance path too:


First things first: I built a very sturdy ramp out of the forms I had left over from the basement project. I had to dig a passage through the pile of dirt that came out of the basement.


The ramp worked really well:


I found it worked best with a half full barrow - much more weight, and I struggled to lift the barrow upright at the top of the ramp....so another example of "little and often."


By the close of play on Thursday, the dumpster was just less than half full:


I think I have reduced the pile of rubble by three-quarters or more, so it's looking good for the pathway.

While all this was going on, Amy Sheep was working on what will be out Prize Pumpkin Artichoke Patch. At the start of play it was looking a bit neglected:


This is later after all the weeds have been pulled and the dirt has been turned over with the jackhammer's spade attachment. The pile of ornamental rock in the foreground needs to find another temporary storage location.


The last little bit of our fenced-off enclave has also become somewhat overgrown in the last few months. If this was part of a golf course, it would be deep rough at best.


Most of the weeds were removed from this area just in time for the day's last over.


Friday


Friday was another somewhat dull day - perfect for what we had in mind in fact. After a quick breakfast of pain au chocolate and café latte, Amy Sheep picked where she left off with the weeding.


I carried on humping increasingly smaller bits of broken brick and concrete into the dumpster and by late morning I was done, and the tarps had been pulled up.


Next victim: the pathway between the street and the brick porch we don't have anymore. I started off by popping out the brick ribbons - this bit was a piece of cake.


About this time is when the folks from tut' Rock and Soil came by and dropped off four cubic yards of ye finest olde topsoil.


I was feeling pretty good about my progress with the path, so I took a break from jackhammering and helped Amy Sheep dump some of the topsoil on the soon-to-be pumpkin artichoke patch. 


This is later after the topsoil has been spread out to uniform thickness:


This is the downhill area after weeding and after we removed another half dozen or so barrows of infertile subsoil.


At this point Amy Sheep had to run to silly point for a couple of hours so I went back to demolishing the concrete path and transferring the debris to the dumpster. Most of the slab was six (6) inches thick so this turned into quite some effort.


The dumpster was starting to look a lot closer to full than empty by stumps; this is a legacy of the concrete path being so thick!


Saturday

I was out on the pitch bright and early after just a quick piece of toast and got the ball rolling by building a ramp to the downhill area.


Then it was back to breaking concrete. This was hard work because the concrete was so thick, and I was becoming concerned over whether there would be enough space in the dumpster.


While that was going on, Amy Sheep was depositing more premium topsoil at the downhill bed. The exact moment when the dirt spreading was completed did not make it into the photographic record. What is most memorable about that instant is that it signaled Amy Sheep's rapid departure from the crease in the direction of the Nursery (or tut' Garden Center as my grandpa would have called it).


I carried on plodding away with the pathway. By late afternoon I had got rid of all the big chunks.


Eventually it was done! The pathway has left a scar in the landscape that is four feet wide and almost a foot deep. 


This is what a completely full dumpster looks like:


And this is what a driveway looks like when it is partially filled with broken up concrete:
.

By this point Amy Sheep had returned heavily laden with a variety of plants, but unfortunately no pumpkins. Looks like we missed the boat this year. Instead, we'll be growing artichokes in the uphill bed and a variety of drought-tolerant plants and flowers lower down.



It is very important to liberally water new plants:


Sunday

After two and a half days of very hard labor, the plan for Sunday was take it easy. We kicked off by spending two hours on the couch watching the Monaco Grand Prix. After that is was time to pad up and head back to the crease.  We had some topsoil left over which we dumped in the area which until a few days ago was covered with broken up brick and concrete.

We also spread out some coarse gravel in the valley where the entrance path used to be. And that was it. The rest of Sunday was reserved for socializing and relaxing.

Monday

If you were paying attention at the beginning, then you may be wondering why I mentioned buying plumbing fittings. The answer is that when we built the porch a few weeks ago, I had to remove to hose bib that was in the way....and the time has come to replace it.

This is view of the hose bib supply line from inside the basement. I fitted a removable brass cap after I cut the pipe back.


This is the same supply line  viewed from further away - it passes through the stud wall which supports the porch. I've been wanting to strength this section of the foundation for a while, and it will be much easier to do so without the pipe in the way.


So....after shutting off the water and draining the system, I used my close-quarters pipe cutter to chop the pipe back a couple of feet in front of the stud wall, and fitted a new shutoff valve. 



With the pipe out of the way I was able to fit a plywood panel and install it with the appropriate nailing pattern. 


I also installed similar panels at the perimeter of the new section of the basement - these panels are not structural, and are just held up with a few screws. After that I decided the plumbing lines and hose bibs can wait until next time.  



There was just enough time left to to check on our strawberry crop - we have been getting tons more fruit this year.