Showing posts with label miter saw. Show all posts
Showing posts with label miter saw. Show all posts

Tuesday, January 30, 2024

Miter Saw Station

While the cat is away, the mice will play! Or to put that another way, while it is still raining outside, the workshop is the only place to be! 

I've got a nice Dewalt miter saw in my shop - the same one I've been using since about 2008, although I've been through a number of blades since then. In September last year, when I reorganized the "big" tools in my workshop and connected up the dust collection system, the miter saw ended up at the front of the main shop:


I've spent a decent amount of time working in the 'shop since then and have determined that this is a good central location where the miter saw is going to stay. So.....after all these years of use, it's finally time to build a proper miter saw station. I'm making use of some lumber I salvaged from the pallet that was used to deliver our new deck boards and, of course, more of the plywood that was "recovered" from the deck.


I can't say I designed this myself because I didn't - I copied this build on youtube. It is a very simple but strong design where each leg is made up of two sections of lumber which are glued and screwed together: 


A pair of legs can then be connected using two shorted sections of timber and several pocket screws: 


Two such assemblies can be bridged with three longer pieces and the top strengthened with several cross-braces. I am deliberating leaving the base of the structure "open" at the front because I plan to build drawers and cabinets to go in these spaces in the future.


Moved the first bench into its approx. position:


Then I made a second identical bench and constructed a platform between the two benches to hold the miter saw. The platform sits about six inches below the top of the benches. 


I used the laser level to get the benches absolutely level, and then anchored them to the cinder block wall with tapcons:


I installed plywood top panels on both benches and at the central platform. I cut the panels slightly oversize and then trimmed the excess off with the handheld router to achieve a perfect fit.


At this point the saw bed sits fractionally below the level of the benches:


I used some large washers to shim the saw bed up to the perfect height:



I had to add an outlet for the saw - it has been running of extension cords for the last few months:


The miter saw is too far away from the dust extraction system, so I will be using the shop vac to harvest dust from the saw. I also added outlets below the central platform to power the shop vac.


The final step is to build the fences. I'm using two strips of 3/4 inch plywood which are fastened together at 90 degrees:


The front plate is made from a third strip of plywood - this makes a very rigid assembly. Before adding the front plate, I cut a 1/4 inch x 3/4 inch groove for the T-track channel (blue) and a very shallow 1/2 inch wide recess for the measuring tape:


Cross-section of the final assembly: 


I used the laser to align the two fences and the saw prior to the final install. The fences were attached to the benches with wood screws and the saw was fastened to the central platform with lag bolts.


I installed the self-adhesive measuring tapes last. I have left-to-right and right-to-left tapes, so I can cut on either side of the blade. The tapes were lined up and trimmed very carefully... 


I also made some "first attempt" stop blocks. I have a couple of thoughts on how I might refine these in the future:


The finished miter saw station - it would have been much easier to build this if I already had it...

Monday, September 18, 2023

Workshop Re-Org

It's a well-known fact that the Eiffel Tower can be six inches (15 cm) taller during the summer. As the mostly iron structure heats up, the particles gain kinetic energy and expand.

It's almost as well known that you don't really plan the layout of your workshop - I mean, you can try, but whatever you do the final layout will evolve all by itself. If there ever is a "final" layout. The recent walnut TV console project highlighted a couple of things in the shop that could be improved, with a little bit of time and effort.

The first issue is that the jointer needs to be connected to the dust collection system. Since I got the thickness planer up and running, the jointer is the only "big" tool that doesn't have the dust sucked out of it on demand. 


The other problem was the miter saw. The workshop is basically an L-shaped space where the main work bench is located at one end of the "L" and the cabinet saw is at the opposite end. Which works well. But I found that having the miter saw right next to the cabinet saw was not ideal - the miter saw gets used a lot, so it needs to be in the center of the workshop. It does feel a bit crass to be moaning about the workshop being so big that I waste time walking between tools, but that is the luxurious position of today. 

This situation was resolved by swapping over the jointer and the miter saw. There was no 220 V outlet in this area at the time the jointer was parked there....


But a little bit of tweaking the existing writing and adding a new outlet was all that was needed to bring power.


I'm very happy with the dust collector - it works really well, and the suction can be switched on or off remotely. Still, it has its limitations, one of which is that there are only two (2) inputs. One of these goes to the cabinet saw, and the other one switches between the band saw and the thickness planer. Plus, some of the connectors are taped together, which looks a bit amateurish. 


I invested in a few connectors, three (3) metal blast gates, a "Y" duct adapter, and another section of flexible ducting. 



After assembly of these components the dust collector now has three (3) inputs, which are operated independently by opening one blast gate and closing the other two:


The two ducts which connect to the "Y" fitting serve the cabinet saw and the table saw and are always connected. The duct which goes to the jointer runs across the floor at this point; I may re-route this later if all the big tools stay where they are.


The third duct can be switched between the thickness planar and the band saw; I still need the proper 2.5" to 4.0" connector for the planar; I'm getting by with tape for now.
. 

The miter saw has been parked on a crappy cart where the jointer used to be. I plan to use the shop vacuum for dust collection on this tool. I plan to build a proper miter saw station in this area if it does become the "final" location. This has already proved a much more convenient location.