Thursday, March 21, 2024

Sunday, March 17, 2024

Dining Room Cabinets & Bookcase Part 4

Not much more to do now!  We are using a new-to-us finish for this piece of furniture, namely Rubio Monocoat. It's all the rage on youtube right now, so we thought we should get with the program. It's based on linseed oil and smells very similar. The last time I used linseed oil was to preserve my cricket bat in about 1978. After tests with a couple of pieces of scrap plywood we decided to go for it on the underside of the cabinet first - the rest of the piece is not quite ready for finishing.

After final sanding to 400 grit:


After Rubio Monocoat has been applied:


It takes a couple of weeks for the finish to cure. While that process was ongoing, I righted the cabinet - with some help - and started marking out for the hinges: 


This cabinet has fully inset doors, which I've never made before. I'm using appropriate euro-style full-inset hinges from Rockler/Blum. It is very important to install the hinges in exactly the right place. To make this job easier I used an off-cut from one of the doors to make a mockup - the off-cut is by nature the exact same height as the actual door (29 15/16" if you're interested). After attaching a pair of hinges to the mock door, it can be clamped in the precise position the actual door will occupy. There is a 1/16 inch gap (reveal) between the door and the cabinet at the perimeter. 


This temporary setup enables access to the hinges while the "door" is closed, and makes accurate installation much easier:


Each hinge consists of two pieces which clip together. Therefore, after mounting, the parts can be unclipped, and the mock door removed. The "cabinet" part of the hinge remains in situ. I can then clip a second pair of "cabinet" parts onto the mock door and move to the next cabinet....and then do it all twice more.


The next step is to transfer the measurements from the mock door onto the actual doors. The four doors have been constructed with a specific arrangement of the grain pattern, so it is super important to install the hinges on the inside of each door and at the correct side! I used tape to mark the precise locations and then double and triple checked: 


Like all European style hinges, a 1 3/8 (or 35mm) hole must be bored 1/2" (13 mm) deep at a distance of 7/8" (22.5 mm) from the edge of the door to the center of the hole. Too far from the edge of the door or too close and the hinges will not align. There is also a serious risk of drilling through the door if the depth is not accurate. I practiced getting this perfect while I was making the mockup door; the hole just brushes against the solid walnut at the perimeter of the door when located correctly:


The "door" part of each hinge is installed into the door with two screws:


The door can then be mounted at the cabinet by clipping the hinges back together:


Doors of this type require stops to prevent them from over-closing. I'm using some adjustable plastic stops which can be attached directly to the base of the cabinet. I manufactured some walnut blocks for the upper stops to mount on such that they protrude below the face frame:


The upper stops were glued into the cabinet and clamped for a couple of hours:


All four doors were hung and micro adjusted, and then I marked out for the knobs:


I drilled 5/32" holes for the doorknobs, although I will not actually be installing them until the doors have been finished.


A few "finishing in progress" photos:





This is later after the cabinet has been moved upstairs to the dining room and the shelves and doors installed. There is still a week or so to go before the finish is fully cured; after that it will be filled up with books and other junk!



Next up....building the bookcase which will sit on top of the cabinet...

Thursday, February 29, 2024

From The Archives #9 - PhD by Numbers

Originally published 2004-11-16


Doctor of Philosophy by numbers:

Time: 1088 days or 2 years, 357 days; (1st Oct 2001 – 22nd Sept 2004); (365 + 366 + 365 – 8).

 


Published Thesis....  

214 pages

2,086 paragraphs

49,477 words

255,698 characters

49,396 spaces 


Writing Up.....

Took 73 days at an average 14 hours per day

Created a pile of scrap A4 paper 82 cm tall (ca. 32 inches)

Listened to 981 hours of Radio 5


Consumed while writing..... 

142 ham rolls

71 packets of crisps

132 chocolate brownies

34 chunky Kit Kats

35 blue Bountys

108 liters of Diet Coke

367 tea bags

84 pints of milk

7 bags of sugar

3 jars of Nescafe Gold Blend

And actually lost weight, due to such severe stress...

 

Read....

64 copies of The Guardian

9 copies of The Observer

8 copies of The News of the World

A few books on chemistry (!)


 

 



Saturday, February 24, 2024

Dining Room Cabinets & Bookcase Part 3

The dining room cabinets have been on hiatus for a few weeks while I've been sprucing up the workshop and so on. At this point, the cabinet box is almost ready for face frames and doors....but not quite.

The first order of business was to sand off some glue-related mess from inside the cabinets. This was a tedious process, and one of the reasons why I have not been chomping at the bit to get back to working on this project.


The next step was to drill the holes for the shelf pins. I've done this before with a jig made out of peg board, but it was much easier with the Kreg shelf pin jig.™


Next up: the face frame. I'm making the face frame from black walnut which is a bit less than 1.5" x 3/4" after jointing and planing. I cut the stiles (verticals) first and then clamped them both in the exact position. The rails (horizontals) were then cut precisely to be a tight fit between the stiles.

I had to assemble the frame on top of the table saw because my work bench is not big enough. 


I'm using glue and pocket hole screws to make the connections:


Test fitted the frame and used it as a guide to cut the dividing pieces to length.


Returned to the table saw and installed the three (3) dividers. I cut spacer blocks so that the four (4) openings between the dividers will be identical. 
 

Face frame assembly complete!


Made some cauls from 3"x 3/4" pine. A caul is a slightly curved board which can be used to apply clamping pressure in otherwise inaccessible areas. The curve is made either with careful planing, or more quickly, by installing layers of tape of ever-decreasing length. 


Glue-up in progress:


This is the next day after clamp removal, rough sanding and re-righting:


Started work on the doors....the four door panels were cut to the final width plus about an inch that will be trimmed later, and to the precise final length (minus 0.5").


Yep, minus 0.5", because this will be made up by two 0.25" wide strips of walnut. Strips just like the ones below, which were cut to 5/16" on the table saw and then planed down.


The walnut trim/edge banding was attached with glue and a couple of 23 ga. pin nails to prevent movement, and then clamped overnight:



While I was waiting for the glue to set up, I cut the eight moveable shelves to the final width and test fitted them. The shelves are cut 0.25" short so that I can add walnut trim to the front-facing edges:


The next day (in DIY time) I took the doors back over to the bench and sanded the edge banding flush with the plywood - this has to be done very carefully because I do not want to sand through the veneer.


The doors were then trimmed to their final width and the walnut banding was added to the long sides. The banding was cut to the precise length in advance.


Similar banding was added to the front-facing edges of the shelves:


This is a preview of how the shelves will look installed. This is before sanding and finishing:


I must have mentioned hundreds of times in this blog that I don't enjoy sanding....who does? But it has to be done, so I spent several hours getting the edge trim flush with the panels.


Which gave four very smooth cabinet doors...


...and eight shelves.


Stay tooned for the assembly!