Sunday, October 23, 2022

Under-bench Drawers

I've got BIG plans for my new cabinet saw, but I wanted to start with a non-critical project, something that needs to be well-made, but can cope with the odd small error. In other words, shop furniture. Pretty much all of the drawers and cabinets in my workshop have been commandeered from elsewhere rather than custom built, and as a result some are less than ideal. 

As usual I don't have a great "before" photo because I was too keen to get going, but I do have a picture from a few years ago which shows the drawers under my main workbench: a set of light wood drawers which came from the kitchen in a house I lived in between 2007 and 2011, and a really awful set of dark wood drawers that came from Ashby flea market. Time for a change!

This is a much more recent photo, after the old drawers have been removed, which also shows the woodworking vise I have to build around.

I'm building two (2) identical independent cabinets which will go side by side below the bench. The cabinet on the right will have a shelf at the top instead of drawers; this way none of the drawers will be obscured by the vice handle. 

Cutting plywood sheets into parts isn't very interesting, even if you do have a fantastic new cabinet saw to use. However, one feature which is worth mentioning is the dados/rabbits I cut for the base panels to mount into. The typical way to do this is with a dado blade - my saw takes an eight inch dado set, which I do have, but I don't have the right inset/throat plate. In any case, there is an argument that its not worth the effort of setting up the dado blade just to make four cuts.  An alternative method is to cut a series of slots with the regular blade and just move the fence across in 1/8 inch increments. It's worth noting that dado blades are illegal in the European Union for some reason, so this method if worth considering if you have the misfortune to live there.


Getting the cabinet saw was like letting a cork out of a bottle: I (used to) have a list a mile long of tools I wanted, but didn't really need until I had a cabinet saw. One of these is the Kreg™ pocket hole jig. If you're not familiar, pocket holes are basically screw holes which are drilled at an angle and allow two boards to be securely joined at 90 degrees with appropriate screws. (You can find out more here).


This is how the front and rear stretchers look after the pocket holes have been drilled:


The first step of the cabinet assembly is gluing the base panel into the rabbit in the side panel.  You can never have too many clamps!


I used my new 18 gauge air-powered brad nailer to secure the front and rear stretches in exactly the right position. I would have preferred to buy a decent quality cordless brad gun, but there is no such thing, so I invested in a new compressor instead. I already have a bunch of other air-powered tools which I used for the bodywork on the Mustang.


The brad nails are just used to hold everything in place until the pocket screws have been driven home. This makes for a very strong joint.


The second side panel is then attached to the stretcher in the same way and glued (and clamped) at the base panel:


One down, one to go:


Moved on to cutting parts for the drawers. I'm making everything out of 3/4 inch Baltic birch plywood, except the drawer bottoms which are cut from similar 1/4 inch plywood. You can't really see it in the photo below, but the drawer parts have a 1/4 inch wide and deep dado to accept the bottom panel. 


The pocket holes which will be used to construct the drawers are drilled in the opposite side to the dado, so that they will not be visible inside the drawers. There is no glue used in the drawer assembly


Constructed my first drawer and tested the fit in the cabinet.


Moved into mass production mode...there will be nine (9) drawers in total.


Installing the drawer slides is most easily accomplished by using spacers - the precise measurement of the spacer is somewhat arbitrary, but it is very important that the slides are level and at the same height on both sides of the cabinet:



I also used similar spacers to locate the drawers into the ideal position before attaching the slides to the drawers - there is a 3/4 inch gap between each pair of drawers.


All drawers installed! The top section of the right cabinet consists of a shelf since I don't want to have drawers which are obscured by the vise handle. 


It is difficult to see in the photo below, but this is after oak trim, which I cut to exactly 1/8 x 3/4 inch on my new saw, has been added to the front-facing edge of the cabinet. This will give the effect of real wood instead of plywood once the cabinets are installed below the bench.


Time to make the false fronts. Some years ago, I built some cabinets out of oak plywood which I stained red. I made a bunch of extra shelves, which have been taking up space in various garages and attics ever since. They look like this:


One of them was made into a "temporary" router table about a decade ago:


I also used either shelves or some other leftover material for the drawers I built for my garage work bench... 


I think by now you probably know what's coming...it starts with ripping some old pieces of red oak into 1/4 inch strips.


The shelves were then trimmed to the correct width on the cabinet saw and oak trim was attached with a mixture of glue and 23 gauge brad nails.


These panels were then cut into strips and similar oak trim was glued on to the sides. The excess was cut off by hand with a flush trim saw, and the outer edge was chamfered on the router table.


Installing the false fronts was easier on some drawers than others: 


First cabinet done!


This is later, after final finishing and installation below the bench:


The floor in my workshop is not level, and the opening below the bench is not perfectly square either, so I installed the second cabinet by clamping it to the first one and then making some shims.


All done! After transferring the contents from the old drawers, I now have three (3) large empty drawers and the shelf to fill with other stuff, most of which I probably don't own yet.


Coming soon: Many other projects and a full-on audio-visual shop tour!

Saturday, September 17, 2022

Hayward Airport Open Day

Hayward "Executive" Airport, as it likes to call itself, had a Open Day last weekend, their first since 2019 for some reason. In addition to the various 'planes on display (see below), they reached out to several local car clubs to add to the display, including BAMA. The jewel in the crown of our cars was the '68, making it's first car show appearance since Ponies and Snakes 2009. 








One of the best display pieces was an original Huey that saw action in Vietnam. By taking these photos, we contributed to the cost of keeping it operational.







Anyone want to fly on a Bomber? 




Surely the original pimps motor ?

 

Tuesday, September 13, 2022

Getting Serious in the Workshop

I've wanted a really nice table saw - well, a cabinet saw actually - for a long time.  Finally I have the space, the 220 V outlet and the green backs. Or I did have, before I exchanged the latter for the SawStop™ ten (10) inch 3.0 HP Professional Model with the 36 inch fence. (See the full spec here). This is what (most of) the saw looks like when packed and palletized. 


After unpacking, adding the cast iron wings and mounting the control box and motor cover the saw looks like this:


So far so good, but this is when I discovered I was missing the 36 inch rails. Not the easiest thing to mislay, as you can see from the photo below. The main reason I use the online retailer in the link above is because of their post-order service, so I was only without the rails for a few days.


This is later after I have added the rails, the extension table, and cut my first timber. I love my new cabinet saw!


This photo is from further away; you can see the dust extractor in the background.


There was a very satisfying quantity of dust in the extractor bag after the first few cuts:


We actually acquired the dust extractor a few months ago. We bought it as part of job lot that also included a band saw, a bench-top planer and a jointer. Basically we ran across a deal that we could not refuse. I've been waiting until the cabinet saw was up and running before getting the rest of this kit organized. The band saw is going to live in the basement next to the steps/storage platform. In this location it can be connected to the dust extractor and the 220 V circuit. The band saw is on wheels, so it can be moved away from the walls if we need to cut large workpieces.


The jointer is also on wheels. We don't anticipate using this tool very much to start with. I will have to extend the dust extraction system into the other half of the workshop before we can get it up and running.


Stay tuned to see what we can build from our first few sheets of plywood now that we have all the big boys kit!

Saturday, September 10, 2022

Mustang Running Again

Installing the replacement transmission was a fight, but it was definitely one that was worth winning. Just getting the tranny into roughly the right place under the car was hard enough. I ended up tying it to a scrap piece of 2" x 8" lumber so I had something flat to lift with the floor jack. 


After much wiggling and wrangling, I was able get the transmission to within a quarter of an inch from where it was supposed to be - I just could not get it to slide all the way in (!) close the gap to the bell housing:


Eventually, after much pushing, pulling, swearing and banging my head on various bits of the car, I broke the golden rule and used the bolts to bring the transmission into it's final position. I was careful to tighten the bolts gradually, and keep rotating from one to the next. This process was very successful - there was basically no resistance to installing the bolts. But, all in all, it took most of a day to accomplish this operation.

The next weekend I re-installed the driveshaft and the park brake cables and adjusted the clutch. After that I put the car back on the floor and, with the transmission level, filled it up with ATF. Hopefully this will prevent future seizures. With that done, I test drove the car 10 feet out onto the driveway. Even after sitting for the best part of a year the engine started up right away! 

I flushed the radiator/cooling system while I had the car outside, and then I tested reverse gear by returning it to the garage. I am planning to take the 68 to a show at Hayward Airport next weekend. Before that, I have some very serious cleaning to do.