Fireplace Remodel Day Twelve

Day #12 was only a half day really; it's been a busy week and weekend, so we needed some downtime. By the time we were ready to get back at it, the texture on the drywall was all nice and dry. The walls at the dining room side were painted with primer/stain blocker, and declared finished...apart from final painting.



The same goes for the front side of the living area. This corner of the room is now a useful area for piling up tools and other construction detritus.


The shoe rack got a dividing panel, two completely new shelves at the right side, and two more face plates. Eventually the left side will be a shoe rack with three shelves, and the right side will be a cabinet with doors which match those at the other end of the hallway. I did say eventually! It also got another temporary top panel.


We managed to skim the drywall in half of the lightwell too before we called it a day. So far we have used four of the big 5 gallon buckets of drywall compound.